315 Montgomery Street
Financial District · San Francisco, CA 94104
-
1921
Built.
-
1923
The California Commercial Union Building, designed by architect George Kelham.
-
Nov 1981
Additions alterations or repairs.
-
Mar 2015
1st fl modification to add business office space. work includes new raised fl with access ramp, new offices, new ceiling design. new restrooms, few meeting rooms, and breakroom this also includes new furniture and finishes. n/a for maher ordinance.
-
Apr 2015
New t.i. in partial ground floor work includes new office, new restroom, break room, struct, & m.e.p. work. n/a maher ordinance.
-
Jul 2015
Mezzanine-project includes demolition existing non-structural partitions, door frames, millwork, ceiling grid &tile, sprinkler branches, lighting, power, & finishes. construct similar non-structural items prepared as an unoccupied space. no changed in occupancy/floor area. mep, life safety, sprinkler under separate.
-
Jul 2015
10th floor-project includes demolition existing non-structural partitions, door frames, millwork, ceiling grid &tile, sprinkler branches, lighting, power, & finishes. construct similar non-structural items prepared as an unoccupied space. no changed in occupancy/floor area. mep, life safety, sprinkler under separate.
-
Jul 2015
2nd floor-project includes demolition existing non-structural partitions, door frames, millwork, ceiling grid &tile, sprinkler branches, lighting, power, & finishes. construct similar non-structural items prepared as an unoccupied space. no changed in occupancy/floor area. mep, life safety, sprinkler under separate.
-
Jun 2016
15/f -demolition of existingnon-structural partitions, doors/frame, millwork, ceiling grid & tile, sprinkler branches, lighting, power & finishes. construction of similar non-structural items prepared as an unoccupied space for marketing. remodel common restrooms. separate ti permit. maher na.
-
Dec 2016
Mezz & 2/f- t.i. on 2 floors, work includes new partitions, doors, frames, ceiling, lighting, finishes, casework, electrical, mechanical and plumbing. n/a ordinance #155-13.
-
Apr 2017
10th floor: t.i. for modifications to unoccupied full floor tenant suite. including non-structural partitions doors, interior glazing, ceilings, light fixtures, millwork and finishes. mep and fire, ls under seperate permit. n/a for maher.
-
Aug 2017
1st fl - ti, modify existing banking center. new ucr rooms, atm room, open offices, new ceiling.
-
Aug 2017
Ti on 13th and 14th floors - to construct new partitions doors, finishes & millwork. mep, life safety sprinklers on separate permit.
-
Aug 2017
Ti on 15th and 16th floors - to construct new partitions doors, finishes & millwork. mep, life safety sprinklers on separate permit.
-
Sep 2017
Title 24 mep to add new equipment to tenant improvment on 13th and 14th fl see #201708256002 for ti work maher not req.
-
Sep 2017
1/f- t.i. modifications to include relocated access ramp and stairs, new financial and client advisor rooms & client meeting rooms, new ceilings. existing restrooms and breakrooms to remain. new furniture and finishes. n/a ordinance #155-13.
-
Sep 2017
Title 24 mep on floors 15 and 16 to add new equipment. ref 201708256003 for ti work maher not req.
-
Nov 2017
T.i. alterations to existing 7th floor. new partition, doors, ceilings, light fixtures, millwork, and finishes. n/a for maher.
-
Mar 2018
8/f: modification to an existing unoccupied full floor tenant suite. scope of work includes constructon of non-structural partitions, doors, int. glazing, ceilings, lighting, millwork & finishes. no change in occupancy or floor area. mep, life safety, sprinklers under sep. permit. maher na.
-
Jun 2018
12th fl full floor ti for office mep def floor maher not req; ref permit application 201712116097.
-
Jul 2018
13th floor - t.i. new paritions, millwork & finishes. mep deferred.
-
Oct 2019
14/f: t.i. of existing unoccupied full floor. no change in occupancy use or area. accessible restrooms & drinking fountain under sep permit. maher n/a. formerly known as 13th floor.
-
Oct 2019
5th floor t.i. /interior alateration to existing 5th floor. new partitions, doors, ceilings, light fixtures. millwork and finishes. fully sprinklered building. meps and structural included.
-
Oct 2019
Tenant improvement of 3rd floor. unoccupied full floor. addition of 2 a-3 occupancy spaces and horizontal exit per pre app meeting notes dwg 3a-0.1.0 and 3a-0.1.1. m.e.p. and structural under separate permit.
-
Jun 2025
1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of existing space. no change of use or occupancy. existing bank of america.
-
Jan 2026
Level 17: ti, demolition of existing & construction of new partitions, millwork, lighting, & finishes.
-
Jul 2026
9th & 10th/f t.i. demolition walls, ceilings, light fixture, eletrical, plumbing, minor mechanical, doors, casework, & finiesh. addition of new walls, ceilings, light fixture, eletrical, plumbing, minor mechanical, doors, casework, & finiesh.
DBI holds 417 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 417. 16 of them are nominal $1 street-space or sidewalk permits. The assessor's roll gives 1921; this address is recorded as built 1923.
Nearby
- 300 Montgomery Street Same street
- 400 Montgomery Street Same street
- 555 California Street Same block
- 369 Pine Street Around the corner
- 340–344 Pine Street Around the corner
- 483–485 Pine Street Around the corner