132–142 Church Street
6-unit building with a ground-floor store · Eureka Valley
-
1900
Built.
-
1980
Golden Gate Metropolitan Community Church, established in 1980, met at this address.
-
Dec 1985
Remove interior walls as indicated the plans.
-
November 14, 1989
Robert Durden photographed the property, showing El Quake-o Taquerio.
-
Jun 1997
Termite repair.
-
Apr 2002
Remodel exist restaurant. new entry ramp, counter, toilet, office, storage gyp, bd, patch gyp.bd.
-
Jun 2002
New hood to replace existing hood. new store front to replace.rev#200204265071.
-
Jul 2002
Erect a electric wall single faced sign.
-
Sep 2002
Install fire suppresion pcl wet chemical to protect hood, duct, plum, and cooking equipment under th.
-
May 2006
Install a duct and fan motor only for ventilation @ lightwell of building.
-
Jan 2007
Replace (1) front window with (new) wood frame unti to match existing. replace (1) rear ext. door, repair broken glazing, damaged plaster wall, paint, new kitchen cbinets with countertop. comply with nov#200682756.
-
Mar 2007
Replace front staircas.
-
Apr 2007
Revision to approved #200703025303: revise length of landing so that stair run terminates within property.
-
Aug 2012
Voluntary safety upgrade to existing sill plates (confirm existing anchor bolts or install new as req'd). install bew 5/8" x18" long epoxy anchor bolts @ 32'o.c with 8" min embedment and placed per 2010 cbc 2305.1.4. add 5 ply cdx plywood.
-
Sep 2012
Voluntary safety upgrade to existing garage with 3 new steel moment frames to take lateral loads as shown. no vertical house load in frames.
-
May 2020
Replace rear yard stairs in-kind.
-
Apr 2024
Kitchen remodeling, 2 bathroom remodels, full electrical upgrade in the unit. remodel in-kind.
-
May 2024
Remodel 2nd floor plan, remove brick chase, relocate kitchen, remove wall between kitchen and bedroom, rearrange walls at bathrooms. reframe opening at floor and roofing. note: remodel of bath rooms, kitchen and furnace under seperate trade permits.
-
Sep 2024
One unit - remove existing brick chimney @ living rm & bed rm; relocation of kitchen & bedroom; remodel bath #2; add new laundry closet. chimney removal @ four units.
-
Oct 2025
Replace existing failing stucco and replace existing plywood if necessary (in-kind), install waterproofing membrane with 3 coats stucco system.
-
Feb 2026
One unit - remove partition walls and new partition wall. remodel kitchen and bathroom, add a full bath and washer/dryer. relocate furnace and water heater.
3 expired permits are omitted. The assessor's roll gives 1900; this address is recorded as built 1905.
Nearby
- 124–130 Church Street Same street
- 152 Church Street Same street
- 120–122 Church Street Same block
- 118 Church Street Same block
- 158 Church Street Same block
- 43 Belcher Street Same block
- 402–412 Duboce Avenue Around the corner