152 Church Street
Castro (Eureka Valley) · San Francisco, CA 94114
-
1905
Construction began on a vacant 60-by-120-foot lot for San Francisco's Danish community, whose building fund started with 500 Kroner sent by Queen Louise of Denmark.
-
1906
Nearly complete when the earthquake struck, the church came through without much damage and its sanctuary was put straight into use by the Red Cross as a field hospital and a shelter for the injured.
-
April 6, 1906
Completed as the Ansgar Danish Lutheran Church twelve days before the earthquake; it survived and served as a relief centre. The Danish and Finnish Lutheran parishes merged in the 1960s and it was renamed St. Francis Lutheran Church.
-
1965
Renamed Saint Francis Lutheran Church after the congregation merged with the nearby First Finnish (Gethsemene) Lutheran Church of 50 Belcher Street. The statement dates the merger to 1964 in one passage and 1965 in another.
-
Oct 1984
Add 1 bathrm.
-
Nov 1984
Bathroom to be removed & made into a sacristy.
-
Sep 1985
Elevator shoft.
-
Oct 1985
Installation of private residence elevator.
-
Nov 1986
Remodel of existing ground floor parish hall, library.
-
Sep 1989
Install aluminum windows.
-
Nov 1990
Repair face brick with to code anchorage & anchor existing brick.
-
Sep 1995
Reroofing.
-
Sep 1997
Reroofing.
-
Oct 1998
Site improvement terrace, stairs, walls, ramp, drainage, sewer fe.
-
Jul 1999
Revision to app #9822191.
-
Aug 1999
Fully sprinklered building.
-
Sep 1999
Life safety test.
-
Jul 2000
As built/sprinkler plans only.
-
Aug 2000
Furnish & install life safteyfor building.
-
May 2001
Permit extension 9822191.
-
Oct 2002
Install sprinklers linked to fire protection system/revision to app #98922191/9913580.
-
2007
San Francisco City Landmark No. 39.
-
Feb 2011
Replace door/window unit at the south exterior wall of the first floor meeting room.
-
Jul 2012
Reroofing.
-
Jun 2013
Replacement in kind of 2 interior doors water damaged, 1 breakroom/closet & 1 breakrm/mud rm, due to damaged condition of existing doors, remove existing water damaged base cabinet, replace in kind with new cabinets. work will involve no change of existing plumbing or electrical work or fixtures, none of work is occuring.
-
Aug 2024
Reroofing.
-
Aug 2024
Install 18 new sets of double hung wood sashes into existing window opening. new windows in kind and not visible from the street.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. The Market & Octavia context statement describes a building of 1906 at this address; the assessor dates the building on this parcel to 1900. Submit an update