655 Montgomery Street
Chinatown · San Francisco, CA 94111
-
Oct 1981
New construction.
-
1983
Built.
-
Dec 1998
Removal of gyp b.d. partitions, glazing & doors & actg.
-
Feb 2008
7th floor: full floor tenant improvement including demolistion, partition, electrical & ceiling finishes.
-
Sep 2012
Full floor tenant improvement on 5th floor including demolition, dry wall, ceiling work, finishes, mechanical, & electrical.
-
Jun 2013
18th floor - new non load bearing partitions. new light fixtures, doors, ceiling grid and tile. mep and l/s under separate permit18th floor- new locks on elevator doors. for final completion, see aac's comment on front sheet of the approved plan.
-
Aug 2013
4/f- t.i. from shell condition including non-load bearing partitions, doors, frames, interior glazing, casework, lighting, oiling grid, mechanical, electrical, plumbing included. life safety & sprinkler to be designed build.
-
Mar 2014
Non-structural tenant improvement of office space on 15/f, scope of work includes new meeting rooms, break area and open office spaces. all mechanical./electrical./plumbing/sprinklers system under seperate permit.
-
Jun 2017
6th & 7th floors - office ti installation of new partitions and gyp board ceilings; installation of new millwork, countertops and fixtures. new finishes throughout; paint and floor coverings; installation of card readers at elevator lobby and other locations.
-
Jun 2017
5th floor - office ti installation of new partitions and gyp board ceilings; installation of new millwork, countertops and fixtures. new finishes throughout; paint and floor coverings; installation of card readers at elevator lobby and other locations.
-
Jun 2017
6/f & 7/f: ref t.i. 201706078642: mep's including t24: mechanical: install of new terminal vents, ductwork, pipework, pumps and heat pumps, electrical outlets, fixturs and equipment as required. new plumbing fixtures hot/cod water supply, sanitary, vent as required.
-
Jun 2017
Ground floor: convert vacant restaurant space to building office, conference and lounge. new restrooms and janitor closet. mep and fire life safety under seperate permit(deferred). no extrior alterations are proposed.
-
Jun 2017
Ground fl. t.i of vacant retail space to builing services (building management and lounge space). proposed new restrooms for retail. mep & fire life safety under seperate permit.
-
May 2018
Ground floor. t.i. for new general office. new restrooms & janitor closet. m.e.p & fire life safety done under separate permit (deferred). ** maher: n/a **.
-
Jan 2019
Ti suite 1200 - removal and new non structural partitions, break, millwork finishes. ele/plm/fire life safety under sep permit maher na.
-
Jul 2019
5th floor: demolition of interior (per ab17)partitions, door/frames and lighting no exterior or structural work associated with this scope of work.
-
Dec 2019
18/f ste1800: demolition of existing parttioan and assocated power/data, floor finishes & lighting. construction of new partitions, doors, power and tele/data, lighting, millwork and finishes. mep/life saftey and sprinkler system modifications sep permit. maher n/a.
-
Nov 2021
9/f: tenant improvement renovation. demolition of existing partitions, ceilings, plumbing fixtures, casework, lighting. mep deferred submittal.
-
Oct 2022
Converting existing office suite into new spec suite on the 5th floor. demolition of existing partitions and power/data, floor finishes, ceiling and lighting. construction of new partitions power/data, and tele/data, ceiling, lighting, millwork and finishes. mep, fls and sprinklers under seperate deffered permit.
-
Feb 2023
Minimal demolition of existing partitions and associated power/data, floor finishes, ceiling and lighting, millwork and finishes. doors, power and tele/data, ceiling, lighting, m millwork and finishes. all work to occur on 19/f.m mep, fls and sprinkler are under sep deferred permits.
-
Mar 2023
8/f: e conditions, partial interior demolition of non-structural elements, re-use of interior partitions, doors, finshes, ceilings, lighting, mechanical &electrical outlets and switches, addition of n partitions, doors & finishes. modification o flighting & mechanical to accommodate n layout. mep& fls deferred.
-
Aug 2023
Interior t.i on the 16/f to include new partitions to create private office, meeting rooms break area restroom and mothers room. mechanical, electrical and plumbing included.
-
Apr 2025
19/f: ti - demolition existing partitions, finishes, ceiling, lighting. new partitions, doors, finishes, ceiling, lighting, millwork. no structural work.
-
Feb 2026
6/f and 7/f: interior t.i. removal and construction of non-structural partitions, door assemblies, light fixtures, plumbing fixtures, millwork, electrical outlets, and new finishes. mep, fire life safety is deferred.
-
Jul 2026
10th/f ste# 1000: interior t.i. demolition of non-structural partitions, new const of non-structural partitions, ceiling & lighting, millwork, and finishes, mep under separated permit.
DBI holds 532 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 532. 6 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 600 Montgomery Street Same street
- 708–710 Montgomery Street Same street
- 634–640 Clay Street Same block
- 750 Kearny Street Same block
- 659 Merchant Street Same block
- 712–716 Kearny Street Same block
- 7–33 Columbus Avenue Around the corner
- 584 Washington Street Around the corner