42–46 Second Street
East Cut · San Francisco, CA 94105
-
Apr 1984
Alteration of roof.
-
Mar 1985
New drywall ceiling & lighting at interior offices.
-
Feb 1986
Remove interior partitions. electrical/mechanical. concrete walls.
-
Jul 1988
Install stairwell to basement for 2nd means of exit.
-
Nov 1988
Tenant improvement, existing fire sprinkler system.
-
Jan 1998
To erect double faced electric sign.
-
Dec 2001
To erect double faced electric sign.
-
Apr 2004
Remove 2 walls & kitchenette, provide additional floor plugs, change light fix.provide ada assisted.
-
Jun 2004
Move glass front of building closer to street ref 200404070675.
-
Aug 2004
Move glass wall out to street with encroachment. revision 200406156466, 200404070675.
-
Apr 2005
Barrier removal only/restroom construction in bsmnt existing storeroom to be changed to restroom.
-
Sep 2006
Reroofing.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
May 2013
The permit will add a new fire rated door along the property line wall. the door is not a required exit. all work is interior.
-
May 2018
Non-electric wall single faced sign. hub international insurance services.
-
Nov 2020
Interior t.i. and mep. new space to include open office, meeting rooms, and restroom upgrades. no change to egress.
-
Jul 2021
F/a: design, provide & install dedicaated function sprinkler monitoring system for an existing sprinkler system. ref building permit application 202011068418; ref existing sprinkler permit application 8817478.
-
Jul 2022
Lighting and power for ti. ref permit 202011068418.
-
Jul 2022
Adjust automatic fire sprinkler system to provide coverage per area of construction modification. ref permit application 202011068418.
-
Oct 2022
Relocation of existing fire alarm devices. fire permit # 202107285280.
-
Oct 2022
Change of use from retail to office. revision to permit application 202011068418 by previous architect. is the new architect. revised scope of work to include reconstruction of millwork at 1st and 2nd fl. remove proposed meeting room at 1st fl and remove proposed closet at basement. mep revisions included.
-
Dec 2022
Comply with accessible business program: main entry door upgrade, work includes removal of existing interior and exterior push buttons and ex isting door operator. remove components to be replaced with ada compliant push button pedestals and door operator abe 202209144307.
-
Dec 2022
This permit is for change of use, in connection with planning dept. case no 2022-003210cua.
-
Jul 2023
Basement/gr floor/2nd fl: new elevator shaft run from basement-gr/f-mezz-2/f, located in northeastern corner of building, architectural includes new fire rated e xterior walls/roof, new elevator pit, new control room, alterations to existinggr/f conference room.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder and the early tenants. Submit an update