107–109 Stevenson Street
East Cut · San Francisco, CA 94105
-
1907
Built as the Morgan Building.
-
Aug 1995
Seismic upgrade of umb, access upgrade @ entry, elevator, sanit.
-
Jun 1997
Rmve gallon fuel oil tank located in concrete vault sidewalk.
-
Jan 1998
Tenant improvements. partition, finishes, fixtures.
-
Feb 1998
To erect electrical sign.
-
Apr 1998
Fabricate & install 2 new awnings.
-
Apr 1998
To erect electrical sign on wall.
-
Sep 1998
Reroofing.
-
Jan 1999
Remove existing merchandise unit and install new storage.
-
Jul 2000
Install new awning, awning made of tubing three quarter frame and cover with canvas sheet.
-
Jul 2000
Install a new restroom within the tenancy as shown on the drawings.
-
Mar 2001
Seismic upgrade, new braced frame at north elevation to replace window.
-
Jun 2002
Rev#200103063581 umb retrofit general procedure.
-
Jun 2003
Replace existing damaged bollards next to curb on stevenson st. 54" high x 5' pipe bollars-10 total.
-
Oct 2003
Rev.appl#200306025962 drawing revision, revise bollards fm embedded to surface mount with anchor bolts.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Sep 2008
Replace of existing casework and counter. relocation of existing equipment and new plumg fixtures to replace existing minor electric & plmg. associsated with new work; patch floor finishes as applcable.
-
Oct 2008
Minor non-loading improvements within existing office space, remove and replace 3 new walls.
-
Apr 2010
Starbucks. addition of a new hvac unit and modification of existing mechanical ducting as required. existing wall and platform frammg to be demolished and rebuilt to support new mechanical units.
-
Aug 2012
Tenant improvement on the 4th floor to demolition ceiling height non load bearing partitons and construct new full height partitions and finishes. mechanical, el, sprinklers and life safety separate permit.
-
Oct 2012
Reroofing.
-
Sep 2013
Minor t.i to cafe front bar, back bar with reconfiguration. relocate bar equipment, floor sinks, update furniture & casework. repaint existing walls & ceilings for new finish. install new flooring, non load bearing walls. update light fixtures. install vertical grab bars & diaper changing station in restrm.
-
Feb 2014
3rd floor: demoltion of existing non-load bearing partitions on 3rd floor to create vacant space for future t.i. per ab017 space to remain unoccupied and all ada to be addressed under future t.i. permit.n/a for the maher ordinance #155-13 & n/a for interim controls #428-13.
-
Aug 2016
Construct tenant improvement of new dental office creating new non-bearing partition walls, operatories, doctors office & related support areas with new gypsum board ceiling/soffits plus 1 ada accessible restroom/no medical gas piping. maher na.
-
Sep 2017
Erece two (2) double faced projecting non-electric signs for "the dental suite". n/a ordinance #155-13.
-
Mar 2024
To obtain final inspection for work approved under permit application: 2001.0306.3581. all work is complete.
DBI holds 27 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 27.
Not yet documented: the developer and the early tenants. Submit an update