20–30 Second Street
East Cut · San Francisco, CA 94105
-
1914
Built as the Schwabacher Building.
-
May 1984
Interior act of 2nd fl.
-
Aug 1998
Erect sign (wall).
-
Jul 1999
Oti-1 el me l/s sp.
-
Apr 2000
Basement renovation, add new stair.
-
Apr 2002
Convert retail coffee shop to deli (sub-way)sandwiches.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
May 2008
Change of use from retail to restaurant on 1st floor - interior remodel for self serve, 2 new d.a. accessible restrooms, new corridor, new stair. replace glazing at existing storefront. occupant load verification.
-
Sep 2018
Voluntary seismic strengthing @ all floors. basement through roof. upgrade interior lobby finishes replace guard & hand rails @ int stairs. add stair enclosure to omt stair @ basement. accessible toilet room alteration @ 2nd floor. no exterior work.
-
Jan 2019
New 1st floor storfront design, awning & exterior lighting. remove rear fire escape. replace 1st fl office entry door & sidelights. remove finishes @ office lobby & restore ext cem plaster replace & relocate gas vent louvers.
-
Mar 2019
Fire: install 1 wsp with zone control assembly & heads at front fire escape.
-
Oct 2019
2nd fl ti e office space. work includes new floor, wall and ceiling finshes, new non bearing partitions, limited ceiling construction new millwork and fixtures, updated mechanical and plumbing. new restroom and fixtures proposed. no exterior work. life safety under permit.
-
Oct 2019
3rd floor: t.i. of existing office space. no exterior work. t.i. to include new floor, wall, and ceiling finishes; new non-bearing partitions and limited ceiling construction; new millwork and fixtures, new electrical and lighting fixtures; updated mechanical and plumbing layout.new restroom and fixtures.
-
Nov 2019
4th fl - new ti of existing office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.
-
Nov 2019
5th fl - new ti of existing office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.
-
Nov 2019
6th fl - new ti of existing office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.
-
Nov 2019
7th fl - new ti of existing office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.
-
Dec 2019
This permit is for mechanical only. demolition existing vav ac system serving 2nd through 7th floor. provide new vrf ac system for 2nd through 7th fl. ref pa 2018-0907-9479.
-
Dec 2020
3rd fl tenant improvements. m.e.p.. included. life safety under separate permit.
-
Feb 2021
4th fl: interior tenant improvement only including new partitions, doors, floorings, and ceilings.
-
Jul 2021
Install fire sprinker system throughout building per nfpa 13 3rd dl done under sep permit.
-
Jan 2022
5/f: construction of interior partition, act ceiling, lighting, plumbing fixtures, millwork, and finishes. this project is located on 5/f, ste 500. sprinkler and fire alarm system design will be submitted under sep permits.
-
Feb 2022
6th floor: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. this project is located on 6th floor. suite #600. sprinkler and fire alarm system designs will be submitted under seperate permits.
-
Jun 2022
7th fl: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork, finishes. sprinklers and fire alarm under separate permit.
-
Dec 2023
2/f: construction of interior partition and demountable furniture, act ceiling, lighting, plumbing fixtures, millwork and finishes. mep and life safety under a separate permit.
-
Jul 2024
Deferred mep for permit application 202312082195. no exterior work.
-
May 2025
1st floor: installation of non structural partitions, and new finishes. this project is located on the ground floor. mep under seperate permit.
DBI holds 69 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 69. 8 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update