625 Market Street
East Cut · San Francisco, CA 94105
-
1907
Built as the Metropolis Trust & Savings Bank.
-
Mar 1982
Otc alterations permit.
-
Feb 1984
Interior tenant renovations to 2nd, 3rd, & 4th floors.
-
Aug 1986
Demolition hvac and replace interior finishes.
-
Dec 1986
Installing cooling tower on roof.
-
Aug 1988
Interior non-structurl, interiorpartitions & restrooms.
-
Dec 1988
New office remodel, drywall, carpet, plumb, millwork.
-
Jun 1990
Demolition of tenant interiors on 7 floors.
-
Jul 1990
Replace existing tenant-occupied roof penthouse.
-
May 1991
Install partial sprinkler system.
-
Jan 1993
Cti-1 fl 14 ( el me sd).
-
Jan 1993
Cti-1 fl 15 (el me sp).
-
May 1998
Oti-1 6th floor el mb l/s sp.
-
May 2000
Seismic bracing basement 1st & 2/f restrm & stair upgrade at basement 2/f restrms alreay in for perm.
-
Aug 2000
Oti-1 7/f el me ls sp.
-
Nov 2005
Seismic strengthening of basement, g/f, mezzanine, 1st floor and 2nd & 3rd floor.
-
Feb 2008
3rd floor-demolition of existing non-structural partitions provide new, non-structural partitions for office (hvac, electrical, plumbing, sprinklers and life safety to be design build & submitted under seperate permit), building is fully sprinklered.
-
Aug 2012
Involves modifications of existing tenant improvement space to include minor demoltion & construction of non-load bearing partitions, partial new suspended ceiling, grid& tile, rrelocate lights fixtures, new electrical outlets, new office doors, sidelites, frames, new millwork and new finishes.
-
Aug 2014
New elevator equip. & machine room. new raised mechanical. deck new ventilation opening at roof over (el) room. building (new) floor and non structural partitions. all new or revised hvac, electrical, plmg will be design-build and submitted for permit seperately if needed. building is fully sprinklered.
-
Jun 2015
Remodel of existing bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate.
-
Dec 2016
Full remodel of existing banking center. 1. remove existing teller ares. 2. new vault workroom & 2 new atas. 3. new 24 hour vestible. 4. new lighting per title 24. revisions to 201606249734.
-
May 2018
Replacement of existing atms with newer models. atms are located more than 10' from storefront withing interior vestibule. installation of equipment with minor electrical and structural. no change in occupancies.
-
Aug 2019
15th floor t.i includes the demolition of non structural partitions and building new nono structural partitions. mep's, life safety and sprinklers design build submitted under separate permit. building fully sprinklered.
-
Jul 2020
8/f: t.i includes demolition of non structural partitions and building new non structural partitions. new accessible shower room and new mother's room are being added as a building amenity. all new or revised meps, life safety and sprinkler if neede will be design build and submitted under seperately.
-
Feb 2021
Ext facade: stone cladding repair spalls, add pins to broken stones, expoxy inject cracks.window wall repairs: replace existing seals, weatherstripping, paint panels and mullions.fire escape repairs: scrape off loose and flaking paint, replace broken connections, replace missing bolts, coat with hi-performance.
-
Nov 2022
Reroofing.
DBI holds 134 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 134. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update