33 New Montgomery Street
East Cut · San Francisco, CA 94105
Permit history
-
Jan 1983
New construction.
-
Nov 2001
Oti-1, 6th floor, el, me, ls, sp.
-
Apr 2014
7/f: non-structural interior demolition and construction in an existing vacant space for a new tenant. t-24 calls and electrical work under seperate permit. n/a for the maher ordinance #155-13.
-
Jun 2015
Remodel of existing bank space including new private offices, new accessible toilet room, walls, lighting millwork finishes and furniture. no change to use or occupancy. work to include mechanical, electrical, and plumbing. fire sprinkler and alarm work to be under separate permit. n/a for maher.
-
Aug 2015
2, 4, 11 & 12th floors: remodel existing elevator lobbies - including lights, t-bar & finishes. no structural or exterior work. maher na.
-
Mar 2016
17th floor - demolition of existing interior construction & construction of interior partition, doors, millwork, electrical, ceilings & lighting. no structural work occurs. n/a maher ordinance.
-
Nov 2016
2nd generation ti includes demolition of non bearing walls, millwork, finishes and portion of corridor. new interior partitions, glazing, doors/frames, lighting, power, millwork and portion of corridor, no structural maher na.
-
Dec 2016
Full remodel of existing banking center 1. remove existing interior partitions. 2. construct new offices. 3. new accessible unisex restroom. 4. new lighting per title 24. 5. upgrade interior finishes. revision to 201506249741 maher na.
-
Mar 2018
5/f: suite 500 - ti dmeo of non-load bearing walls, millwork, finishes and ceiling, new interior partitions, glazing, doors/frames, lighting, power, and millwork. there is no structural work associated. mep deferred. maher na.
-
Jul 2018
9th fl; suite 950- remodel of an existing vacant suite. demolition includes wall, doors, frmaes, ceiling & lighting of the common corridor for reconfiguration. new non-structure interior walls, door, frames glaze, millwork, plumbing, electrical, ceiling, light fixtures & finishes.
-
Jul 2018
10/f suite 1000: project is a second generation t.i. including demolition of non-bearning walls, millwork, finishes & portion of cooridor, also new interior partitions, glazing, door/frames, lighting, power.
-
Feb 2019
Expansion of existing tenant suite to an adjacent suite, the scope of work includes demolition of interior non-structural partitions, doors, frames, glazing, ceiling at existing suite entry, finishes & electrical, the new consists of new interior non strucural partiton, electrical, doors, frames, mechanical & finishes.
-
May 2019
2nd fl: expansion of existing suite #220: includes demolition of existing wall, door, millwork, ceiling, glazing, power, ltg, plmg, & finishes. standard t.i. non structural including nw walls, doors, glazing, power, plmg, ceiling, ltg, finishes, & millwork. update 2nd fl. men's/women's restroom. to comply 2016 cbc.
-
Nov 2020
10/f: suite #1900 - selective demolition of non-load bearing partitions, electrical, ceiling, lighting, and finishes. standard improvements to include new partitions, doors and hardware, glazing, ceiling, lighting, finishes, and mill work.
-
May 2021
Floors 15 & 17 t.i.: minor demolition, new wall, door, finishes, millwork, lighting, unconcentrated furniture with mnor electric work.
-
Dec 2021
Basement: demolition non load partitions, restrooms, concrete ramp, stair and small elevator, suspended ceiling and light fixtures, gypsum ceiling, and electrical. new construction: fill in ceiling, restrooms, doors, frames and hardware, ada lift, call button, card readers, fire existing, cabinet, finishes.
-
Mar 2023
14th fl- ti to include new interior partitions, glazing door/frames, new lighting and millwork. mep, sprinkler and fire alarm to be deferred permits.
-
Mar 2023
20/f: t.i to include new interior partitions, glazaing doors/frames, new lighting and millwork existing ada compliant restrooms to remain. mep and fire life safety under sep permit.
-
Mar 2023
18/f: t.i. include new interior partitions, glazing, doors/frames, new lighting and millwork. existing ada compliant restrooms to remain. no structural. mep deferred.
-
Apr 2023
19/f- ste# 1900: selective demolition of non-load bearing partitions, doors, millwork, ceilings. new partitions, doors & hardware, power, ceiling, lighting & fixtures.
-
Apr 2023
14th fl - ti work to inlcude new lighting & mechanical work @ 14th fl. ref pa 2023-0309-3307.
-
Dec 2025
9th/f t.i. new partitions, offices, conference rooms, and 14 new phone booths. mep deferred.
-
May 2026
1. modify the central cooling plant. 2. existing chillers will be demolished, and new chillers will be installed. 3. cooling tower vibration isolation springs on the roof will be replaced.
-
Jun 2026
18th floor, suites 1810 and 1840: market ready improvement for office suite(4, 500 sq ft)combing suites and constructing new walls, lighting, flooring, drinking fountain & stall accessibility.
DBI holds 627 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 627. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update