39–61 New Montgomery Street
East Cut · San Francisco, CA 94105
-
1912
Built for the Sharon Estate Company, which also rebuilt the Palace Hotel and much of the rest of the street.
-
Oct 1986
Install 1 counter/install new light fixtures & 2 outlet.
-
Mar 1994
Demolish exist. partitions, install new stairs, lockerooms.
-
Jul 2006
Remodel locker room, showers, restroom including ceiling lighting, fixtures, this work does not create an increase in floor space. l/s spklr under separate permit.
-
Jul 2007
Mezz & 2nd floor-demolition of existing non-structural walls, install new walls for 3 new exercise rooms and new chropractic offices on mezzanine level.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Oct 2010
Relocate wall between kitchen & customer area. install new cabinetry in customer area. door swing @ entry to remain as is. add new finishes in customer area only.
-
Sep 2019
Floors 4-8: selective demolition of non load bearing partitions, ceiling finishes, light fixtures, millwork, and plumbing fixtures. no ceiling demolition. vacant under ab-017. n/a for maher.
-
Feb 2020
Demolition of sidewalk & basement area, new construction of new underground pg & e vault installation.
-
Aug 2020
New fire rated shaftwall construction for new electrical & mechanical systems on level 2 to 8. new fire protected stair enclosures. new electrical room in basement & 1 hour fire rated corridor on roof new mechanical units. steel equipment platforms & new tpo single - ply roofing system.
-
Dec 2020
4th fl: tenant improvement. new non-structured partitions & new restrooms. mep's, life safety, sprinklers if needed design build & submitted separately. demolition under permit application 201909192136.
-
Oct 2021
Install 1 backflow preventer, 1 750 gpm at 95 psi fire pump, class 1 automatic wet standpipe system at stair 1 & 2, tie-in existing 2 fdcs to standpipe system, install automatic wet sprinkler systems on floor 2-8 and penthouse. total added sprinklers 560. ref. permit application 202107124177 & 202109295406.
-
Dec 2021
Replace existing obsolete firelite facu with new addressable est facu & led annunciator. notification & initiating devices will be replaced on like-for-like basis. new monitor modules. errcs system monitored by fire alarm system. new two-way communication system infrastructure backbone provided.
-
Jan 2022
1st floor lobby t.i. ground floor lobby including updated light fixtures and floor finishes. no mechanical or plmg work. deferred submitall. electrical, fire portection as required and fire alarm as required.
-
Feb 2022
Addition of a new roof deck on the 9th lvl or 8th floor roof converting this level to an occupied roof deck as amentity to the commercial office. new 735 sq ft roof deck, roof deck planters, egress paths, perimeter guard rails, new 2-stop elevator for accessibility & extending two mstairs to roof.
-
Mar 2022
4th floor: title 24 mep to add new lighting, power, and hvac equipment.please refer to permit application 202012080508 for t.i. work on 4th floor.
-
Jun 2022
3rd/f t.i. barrier removal to provide new fully accessible complaint restroom and drinking fountains within existing demolition'd shell space under pa 2019 0919 2136. all new revised mep & life safety under seperated permit (fully sprinklered).
-
Jun 2022
2nd/f t.i. barrier removal to provide new fully accessible complaint restroom and drinking fountains. all new or revised mep & life safety under seperated permit (fully sprinklered).
-
Jun 2022
7th/f t.i. barrier removal to provide new fully accessible complaint restroom and drinking fountains within existing demolition'd shell space under pa 2019 0919 2136. all new or revised mep & life safety under seperated permit (fully sprinklered).
-
Jun 2022
6th floor: barrier removal consist of providing new full accessible. compliant restrooms withinexisitng demolition'd shell space under permit. 201909192136; drinking fountain; all new or revised mep and life safety will be design build and submitted separately.
-
Jun 2022
5th floor: barrier removal consist of providing new full accessible. compliant restrooms within exisitng demolition'd shell space under permit. 201909192136; drinking fountain; all new or revised mep and life safety will be design build and submitted separately.
-
Jun 2022
8/f: barrier removal consisting of new fully accessible compliant restrooms within existing demolition'd shell space under permit 201909192136. drink fountains, all new or revised meps, life safety work will be design built and submitted separately.
-
Mar 2023
To provide an emergency response radio coverage system (errcs) including backbone that meets state and local codes and requirements.
-
Dec 2025
3, 5, 6, 7, 8th/f: identical t.i. new men's/women's restrooms, kitchenette/snack for office use only. interior work only.
-
Mar 2026
Remove non-compliant convenience stair 3 add non-bearing office partition @ floors 3, 5, 6, 7 & 8. no change of use on office floors.
-
May 2026
Ground floor/mezzanine improvements, add restrooms/kitchenette, non-bearing partions, to ground floor, add kitchenette/snack counters and non-bearing partitions to mezzanine (no catering service).
-
Jun 2026
Floors 3, 5, 6, 7 & 8: m.e.p permit for bpa 202601214251 and 202603026767.
DBI holds 73 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 73. 7 of them are nominal $1 street-space or sidewalk permits.
The report gives this building's address as 39 New Montgomery Street in its inventory table and 57-61 New Montgomery Street in its narrative. Not yet documented: the developer and the early tenants. Submit an update