77 Beale Street
East Cut · San Francisco, CA 94105
Permit history
-
May 1983
Additions alterations or repairs.
-
Jun 1986
Remodel the 6th floor 77 beale street & a part of the 12th.
-
Jul 1988
A full remodel of an exist fl.
-
Oct 1988
Demolition & rebuild office floor, install new partitions/fixtures.
-
Jan 1991
Cti-1.
-
Sep 1991
Alterations to exist.space to create a daycare center.
-
Mar 1992
Chiller replacement.
-
Mar 1993
Non-struct/interior alt to existing space/no chg of use/occu.
-
Nov 1993
Replace existing cooling towers inside existing structure.
-
May 2003
Replace existing boilers with new hydronics. chiller/boiler room code upgrade, repair york chiller air & wat.
-
May 2010
Full tenant improvement including new open & private office, conf. rm., idf, restrooms, mep system & life safety for 77 beale, no structural work. life safety & sprinkler under separate permits.
-
Oct 2010
New roof top window washing equipement at roof top and new stabilization anchors at building curtain wall.
-
Apr 2013
Proj will create new electrical vault to accom new12kv svc feeders, new electrical main distribution switch gear rm & allow routingnew electrical bus way fromnew electrical rm in basement up thru building to provide alternative electrical svc to current building loads. this will allow floor by floor cut over & replace of existing electrical.
-
Dec 2015
Total building electrical distribution replacement level b2 through 34. modification to the existing level b2 electrical room inluding architectural, mechanical & electrical. n/a for maher ordinance155-13.
-
Jul 2016
3rd fl: tenant improvement of existing offices & storage, to convert into medical offices, fitness area, and conference room for pg&e employees. life safety deferred. n/a ordinance #155-13.
-
Dec 2016
10th floor - office t.i., structural, mep for full floor to prepare for future tenant. n/a maher ordinance.
-
Dec 2016
9th floor - office t.i., structural, mep for full floor to prepare for future tenant. n/a maher ordinance.
-
Jan 2018
27th fl - full floor buildout. partitions, mep.
-
Jan 2018
8th fl - full floor buildout. partitions, mep.
-
Feb 2018
Fsd and vav upgrade at 11th and 15th floor only. n/a for maher.
-
May 2018
Upgrade to existing hvac system on 32nd fl adding new vavs, replace control valves, balancing, fsd improvements - adding 5 new fsds and 17 existing fsds intrfaced to icdiacator panel, new bms controls maher not req.
-
Oct 2018
Replace existing fsd's and install core vav's. upgrade on the 15th floor. install new fan coil units on the 15th and 16th floors. upgrade existing vav's downstream of ahu on 15th and 16th floor. replace existing ahu on the 16th floor.
-
Oct 2018
Replace existing fsd's and install core vav's on the 11th floor. hvac upgrade.
-
Feb 2022
Renovation of 77 beale aka 200 mission.replacement of facade, elevators, mechanical, electrical, plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.
-
Jun 2022
Work on unoccupied floors b3, b2, b1, 1, 3, 10, 25, 30, 32, 33: comply with ab-017, work is for isolated exploratory demolition of existing non-structuatl building elements to explore, examine, & sample. any mod to existing fireproofing or fire rated constr will be patched immediately after. no mod to existing fire sprinkler.
DBI holds 477 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 477. 23 of them are nominal $1 street-space or sidewalk permits.
Falcons, and a proposal to demolish
A pair of peregrine falcons has nested on the upper floors since 1987. In July 2025 the developer Hines proposed demolishing the building and putting a 1,225-foot office tower on the site.
Not yet documented: the year the building went up, the developer, the early tenants and who designed the open space. Submit an update