215–245 Market Street
East Cut · San Francisco, CA 94105
-
1922
Built as the P G & E Building.
-
Nov 1981
Additions alterations or repairs.
-
Jun 1987
Remodel portion of 1st floor, not increase office space.
-
Jul 1987
Handicap modifications, interior cab to elevators.
-
Apr 1988
Construct interior ti & new support for floor.
-
Nov 1992
Asbestos abatement.
-
Jan 1993
Seismic retrofit, core & shell construction.
-
Jan 1993
Additions alterations or repairs.
-
Jun 1994
Fire protection design and installation sprinkler system.
-
Sep 1994
Tenant interior improvements in connection to site alteratio.
-
Aug 1995
T/i 1 additional bathroom install wall install safe & atm.
-
Feb 2007
Preparation of existing exposed substrates for installation of new flashing, gutter linings to match existing, historic flashing/gutter.prep of wall surfaces at select locations for installation of new wall to roof tile flashings to match historic flashing, installation of new non glazed (245 market).
-
Oct 2009
Reroofing.
-
Mar 2010
New turnstiles for security and new ada counter at guards desk for ground floor lobby locations.
-
Sep 2010
Install support beams with isolators for future 2-600 kw diesel generators & support for future exhaust pipes. generator & exhaust pipes' under separate permit.
-
May 2012
Voluntary upgrade of visual notification appliances on existing phase ii. fire alarm permit. 42 new power supplies, 18 sync modules, 987 new notification appliances (strobes and speaker strobes).
-
Dec 2013
Replacement of (6) air handling unit on 4th floor penthouse. 6 return/exhaust fan motors with vfds. replace reheat coil valve controls on 1st/mezzanine floor. replace fire dampers on 4th floor penthouse with fsd and monitoring panel.
-
Jun 2014
Replace existing windows on n, e, & s elevations with new wood windows. n/a for the maher ordinance #155-13.
-
Feb 2015
Revision to permit application 2014.1118.1733 - install new electrical equipment & relocate existing mechanical equipment provide new concrete pad for all equipment. n/a maher ordinance.
-
Dec 2015
Basement/13th fl: replace 4 ats switches with wire conduit as needed. build concrete housekeeping pads, new door and frames in electriclal rooms. n/a maher ordinance.
-
Mar 2017
Maintenance and repairs to exterior walls. n/a ordinance #155-13.
-
Aug 2017
Demolition partitions, doors, millwork, floor & mep. create offices, ada restrooms, breakroom, load bearing partitions, mep.
-
Feb 2018
Revision to app#201708104421. work consisting of interior t.i. partitions, ceiling, finishes and mep. n/a for maher.
-
Sep 2020
Replace existing diesel fire pump with electric, replace controller of other electric fire pump.
-
Sep 2022
To construct a 88-story, 808 dwelling units, type 1-a building.
-
Dec 2022
Alteration & addition toexisting historic building.work on street facing facade limite tonewwindows, doors 7 mechanical louvers; work on interior sides of building to add horizontal addition of office & retail space; existingbasement will be partially demolished & rebuilt withnew underground parking & building services.
DBI holds 215 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 215. 31 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update