147 Minna Street
East Cut · San Francisco, CA 94105
Permit history
-
Sep 1998
To erect parking assembly.
-
Feb 1999
Renewal of 9818897.
-
May 1999
New fire sprinkler system.
-
Sep 1999
Fabricate & install 12 awnings on the exterior of 2nd floor.
-
Oct 1999
Erect sign.
-
Nov 1999
Install d.a.c.t. (1st floor).
-
Nov 1999
Life safety faire alarm system.
-
Apr 2004
To erect single faced electric sign.
-
Sep 2005
Renew 99013165 and 9818897 to continue work and complete job.
-
Aug 2006
Renew 9908774 ( sprinklers), 9924104 (dact), 9924588 (fire alarm).
-
Aug 2007
8th floor-site permit for sculpture garden, new walls and exits from 8th floor to existing museum. exterior garden and new elevator lobby.
-
Feb 2008
Non-structural demolition of non-load bearing walls and other finishes. remove existing roof membrane and roof drains on 8th floor.
-
Dec 2008
Minor revision to appl #200708068817-s2 - use poured in place concrete topping slab instead of convrete pavers.
-
Feb 2009
Revision to permit application 200708068817s3, add additional garage exaust fan.
-
Mar 2009
Refer to permit application 2007-0806-8817-new equipment & finishes in existing cafe area. no change to existing walls or doors.
-
May 2009
Revision to appl #200708068817 to revise door hardware at rooftop pavillion.
-
Nov 2009
To obtain final inspection for work approved under permit application 9901316; all work is complete.
-
Nov 2009
To obtain final inspection for work approved under permit application 9818897; all work is complete.
-
May 2010
Obtain final inspection for work approved under permit application 9924588, all work complete.
-
Dec 2023
Barrier removal work in existing parking garage structure as required for comliance with san francisco accessible business entrance program - abe# 202211235318 operating force, r & r 10'x12'concrete rrampre-strip accessible route.
-
Jun 2024
Revision to permit application 202312112253 as required with sq ft abe rev 2 electric meter/panel interference abe 22211235318.
-
Jun 2024
Stair landing repair & matal stud wall with dry wall car accident.
-
Dec 2025
Install new 42 level 2 evse charges/2x400amp main service panel/ 800amp 3 phase service panel with new meter.
-
Feb 2026
Fire sprinklers voluntary elevator modernization. remove all sprinklers and sprinkler pipe from elevator machine room, elevator pits and top of elevator shafts. based of sffd letter date 01-29-2026. delet 2 sidewalls and 4 pendent sprinklers.
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29.
Not yet documented: the developer and the early tenants. Submit an update