140 New Montgomery Street
East Cut · San Francisco, CA 94105
-
1925
Completed as the Pacific Telephone Building, a 26-storey office tower then the tallest building in San Francisco and the foremost example of Art Deco architecture in the Central SoMa area. Its design, like the Chronicle building's, shows the influence of Eliel Saarinen's 1922 drawing for the Chicago Tribune Tower.
-
Jul 1981
Additions alterations or repairs.
-
Jun 1982
Building use: offices.
-
Aug 1985
To complete work stated on application no. 8205003.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Apr 2008
Conversion of historic office building to residential (118 units), site permit to remodel all floors, new walls and new stairs seismic strengthening.
-
Oct 2011
Full seismic upgrade of existing office building.
-
Oct 2011
Interior non-structural demolition on all floors. all work to comply with afbc ab-017.
-
Nov 2011
Exterior restoration of existing historic building. construction permit, fire alarm, sprinklers, standpipe, mechanical, electrical under separate permits or addendums. project to meet cfc chapter 14 during construction.
-
Dec 2011
Interior core and shell rennovation of existing office building. all exterior & structural work under separate permits. work includes mechanical & electrical. sprinklers, fire alarm, life safety & generator separate permit.
-
Nov 2012
Fire sprinklers for entire building. replaces permit application 2012-08-16-7549. 2445 sprinklers.
-
Dec 2012
9th floor: interior t.i. to existing office space. work to include partitions, millwork dry wall, finishes and mep.
-
Dec 2012
6th floor: interior t.i. to existing office space. work to include partitions, millwork drywall, finishes and mep.
-
Dec 2012
11th floor-interior tenant improvement to existing 11th floor office space. work oi include partitions, millwork, drywall, finishes, and mep sprinklers and fire alarm under seperate permits.
-
Jul 2013
17th/18th/19th floors-non structural demolition, construction of new interior partitions, new doors, glazing, finishes, flooring, cabinetry, breakroom & drinking fountains. mep, sprinklers, fire alarm under seperate permit- new occupant load and sffd assembly permit required.
-
Aug 2013
New full service restaurant on ground floor. work includes new structure, new interior wall partitions, mechanical, electrical, lighting food service equipment, fixtures, furnishings finishes.
-
Sep 2013
14th & 15th floors-interior tenant improvement including mechanical & electrical.
-
May 2014
Construction of non-structural partitions, doors, frames, hardware, millwork, drywall & acoustic ceiling, grid/tile, finishes. mechanical, electrical and plumbing are design build. fire sprinkler & life safety is design build by general contractor. n/a ordinance #155-13.
-
Sep 2014
22nd fl ti: interior office remodel. constructruction of non related partiton and interior finishes. sprinklers, fire alarm, mechanical and electrical work separate permits.
-
Oct 2019
19th fl - ti work includes non-structural demolition, new non-structural walls, finishes, fixtures. mep deferred.
-
Feb 2022
13th fl: demolition & construction of non-structural partitions, doors, finishes, lighting, ceilings. mep deferred.
-
Feb 2022
18th floor: interior t.i. new non structural partitions, doors, ceiling, glazing, finishes, millwork, new single occupant restrooms and microkitchen. new mep systems and service room.
-
Jul 2022
11th fl: t.i. demolition & new partitions, ceiling, lighting finishes, restroom upgrades, and life safety devices.
-
Nov 2022
12/f: full t.i: partial non-structural interior demolition, new non-structural partition, ceiling, lighting and finishes. new all gender restroom, new mothers' room, new employee cafe with no prep. (all prepacked food, serve self).
-
Dec 2022
10th fl: demolition and construction of new office. new work areas, officds, meeting rooms, all gender restrooms, lactation room and break rooms. mep included.
-
Dec 2023
4/f: t.i. demolition existing and construct new non structural partitions, doors, mep, finishes. elevator lobby upgrade and accessibility upgrade under permit application 202112104161.
-
Dec 2023
2/f: t.i. demolition of existing and construction of new non structural partitions, doors, glazing, finishes, millwork, mechanical and electrical.
DBI holds 419 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 419. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. The report gives this building's address as 134-40 New Montgomery Street and its date as 1925 in most passages, and as 130 New Montgomery Street and 1924 in one. Submit an update