137–159 New Montgomery Street
East Cut · San Francisco, CA 94105
-
1907
Built as Greenwood Block.
-
Apr 1982
Additions alterations or repairs.
-
Jul 1989
Heating and ventilation for floors 4th and 6th.
-
Feb 1990
Voluntary seismic upgrade, earthquake repairs.
-
Jun 1991
Stairwall southeast corner.
-
Jul 1991
Change to stair case details as shown on seismic upgrade.
-
Dec 1991
Horizontal addition.
-
Jan 1993
Upgrade existing building service core and shell new elevators toilet.
-
Dec 1997
Core/shell renovatexisting6-story/bsmt building/2 new elevat/stairway.
-
2008
Recorded in the city's 2008 survey of the Transit Center District, adopted in 2012, as a contributor to the proposed New Montgomery, Mission & Second Historic District.
-
Sep 2009
New partition walls, new break room, electrrical, mechanical & plumbing work. no exterior work. no structural removal.
-
Jan 2018
5th fl ti - new non load bearing partitions, suspended, ceiling, lighting, electrical. restroom accessibility. electrical/mechanical under separate permit. maher na.
-
Jan 2018
4th fl - ti new non-load bearing partitions, suspended ceiling, lighting, electrical. restroom accessibility electrical/mechanical under separate permit. maher na.
-
Jan 2018
6th fl ti - new non load bearing partitions, suspended, ceiling, lighting, electrical. restroom accessibility. electrical/mechanical under separate permit. maher na.
-
Jan 2018
3rd fl ti - new non-load bearing partitions, suspended ceiling, lighting, electrical. restroom accessibility electrical/mechanical under separate permit. maher na.
-
Mar 2018
Pyro comm will provide 1 power supply, 10 relays, 8 duct detectors, 34 audible/visual devices, and 1 monitor mode.
-
Dec 2025
Relocate existing rooftop mechanical equipment in area of work, remove skylight in area of work, upgrade and extend existing elevator to rooftop, reconfigure and extend existing exit stair areas at 6th floor to roof, create new occupied roofdeck area, new counter area, exterior lighting, guard rails, roof.
-
Feb 2026
Non-structural interior demolition on floors 4, 5, and 6 per ab-017.
-
Mar 2026
Select demolition of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use from ground floor retail to cafe.
-
Apr 2026
Commercial tenant improvement of existing floors 5 & 6.
-
Apr 2026
4/f: commercial ti of existing 4th floor. scope of work includes partial demolition of interior non-bearing walls, ceilings, light fixtures and existing flooring. new construction of non-bearing walls, finishes, power (as required), and associated mep improvements.
-
May 2026
Relocate main building lobby for 149 new montogomery. select demolition of partitions, millwork, and electrical for core and shell work. flooring level and layout adjustments revision to ground floor storefront including new lobby entry door and infill of previous cafe entry with insulated safety glass.
-
Jun 2026
New partitions for mail room and securiety desk area on gr fl for common building lobby. new furring, floor and wall finishes for lobby, hallway and elevator lobby, new lighting basis of design in area of work. no changes to exterior or historic fabric- mep deferred.
-
Jul 2026
Stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements.
-
Jul 2026
Minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork.
-
Jul 2026
Roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f.
-
Jul 2026
Ground floor: select demolition of one bay of storefront and semi-circular overhang above new replacement entry with pilaster details, header and crest, new entry door and door hardware. replocation of existing lights in the soffit.
DBI holds 173 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 173. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update