536 Mission Street
East Cut · San Francisco, CA 94105
Permit history
-
Jul 1982
Additions alterations or repairs.
-
Jul 1988
Replace roofing, new stair, stiles over ducts.
-
Nov 1990
Structural seismic repair to east wing reinforcement.
-
Nov 1991
Asbestos abatement in east wing remodel of steampipe insulat.
-
Dec 2001
Fire sprinkler at portion of new building.
-
Apr 2005
Remodel of basement level at law school library includes adding new compact shelving & upgrading.
-
Apr 2006
Partial floor renovation of existing office and adult education (bocc) space to become office (bocc) space for same tenant. work in plaza level below ground floor.
-
Dec 2007
Partial renovation of portion of building, replace office space with adult education library space and office space. creating of a3 in library. sprinkler on seperate permit.
-
Apr 2010
Golden gate university-6th floor-renovation of existing classsrooms and office space to update finishes, ceilings, light fixtures, opearble partitions, mechanical and electrical upgrades. fire sprinklers to be installed over entire 6th floor.
-
May 2011
Reroofing.
-
Aug 2012
Installation of 24 at & t outdoor panel antennas & ancillary equipment to be mounted on existing penthouse & parapet. 300 sq ft. at & t equipment racks to be mounted in new equipment shelter on existing roof. 230 sq ft. antenna coaxial transmission lines from rru to antennas. power & telephone service to be.
-
Apr 2013
Renovation to 4th fl of existing building including new interior partitions, new finishes, new exterior windows and associated accessibility upgrades. no change to use or occupancy. mechanical under seperate permit.
-
May 2013
Install vav boxes, install new ductwork, install new air handler in mechanical room. demolition existing ductwork. add 5 fsds, vavs, 1 ahu. fan shut down per ls plans.
-
Dec 2013
3rd floor: renovation of classrooms in 3rd floor of existing building, new interior partitions and finishes, required accessibility upgrade. mechanical and electrical under separate permit.
-
Apr 2014
Classroom and lecture hall renovations to the mezzanine & 2/f including new interior partitions, new finishes, new tiered concrete floor & associated accessibility upgrades. no change in use or occupancy, new exterior windows.
-
Apr 2014
Classroom & lecture hall renovtions to the mezzanine & 2nd floor of existing building including new interior partitions, new finishes, new tiered concrete floor, new exterior windows & associated accessibility upgrades. no change in use or occupany.
-
Jun 2014
2nd floor - provide title 24 for t.i #2014.0430.4585. n/a maher ordinance.
-
Nov 2014
5th floor: renovations to the 5th floor classrooms of existing building including new interior partitions, new finishes, new exterior windows, new lighting and electrical, new mechanical distribution and associated accessibility upgrades, no change in use or occupancy.
-
Jan 2015
Partial renovation of the plaza, 1/f & 6/f of existing building including demolition of existing non-structural partitions & existing finishes. new non-structural partitions, new finishes & associated acessibility upgrades. no change in use or occupancy. electrical mechanical, fire alarm & fire sprinkler.
-
Feb 2015
Remove all distribution ductwork on the floor.install a ddc variable air volume distribution sys & new hot water reheat distribution to all zones, relocate one supply diffuser in 1st floor lounge. provide new supply & return air @ 6th floor lounge 6200, replace vav box modify ductwork, provide air/water.
-
Feb 2015
1st & 6th floors: title 24 approval, reference 201501155843.
-
Mar 2015
Partial renovation of the 1st floor & mezz of existing bld. include demolition of non-structural partitions and finishes, and new toilet rooms, new non-structural partitions and new finishes.
-
Mar 2015
Partial renovation of 2/f, 3/f & 5/f of existing building including demolition of existing non structural partitions & existing finishes. new non structural partitions, new ceilings, new lighting and new finishes.
-
Apr 2015
Mechanical work 1st fl and mezzanine ref 201503029644 install (6) new vav boxes with reheat coil, install ductless split systems, install air handler on mez floor. install new ductwork and registers.
-
May 2015
2nd floor demolition: install 6 vav boxes with new distribution duct work. install new fan coil.3rd floor: demolition & install 4 new vav boxes with new duct work plus 6 new vav boxes. 5th floor: demolition and replace roof caps, demolition & install 7 new vav boxes with duct work. replace controls. ref app#201503160912.
DBI holds 141 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 141. 4 of them are nominal $1 street-space or sidewalk permits.
Eligible, and proposed for demolition
A historic resource review by Page & Turnbull in 2026 found the building eligible for the California Register as an example of Late Modernist and Brutalist architecture, describing an inverted ziggurat of board-form concrete alternating with red brick veneer over waffled concrete soffits, and treating the sunken plaza, the entrance bridge and the seating as one composition with the building. The site is under an option agreement; the proposal is for two towers of 47 storeys in its place.
Not yet documented: the year the building went up, the developer, the early tenants and the date of the last recorded sale. Submit an update