535 Mission Street
East Cut · San Francisco, CA 94105
Public art
- Applique da Parete — Gordon Huether
Glass mounted to stone backing; lobby wall, visible from street (Shaw Alley); Artwork is accessible from 8am - 6pm (M-F); it is visible from Shaw Alley.
Installed 2014. A 140-foot-long, 18-foot-tall installation of 355 individual glass panels on Corten steel, commissioned by Boston Properties along Shaw Alley. - The Band — Anton Josef Standteiner
Bronze, copper, steel; In POPOS, corner of Minna & Shaw; artwork is always accessible.
Installed 2014. Four bronze, copper and steel sculptures, each about 10 feet tall, representing members of a music group at Minna Street and Shaw Alley.
Permit history
-
Aug 1984
New construction.
-
Jul 2000
To erect 25 stories of office/parking.
-
Aug 2005
To erect a new 27 stories with 1 basement building for retail/office/parking.
-
Mar 2006
Grading. excavation, shoring & bracing in preparation for new construciton permit application 2005/08/047/9463's'.
-
Mar 2008
Tieback soldier pile and wood lagging shoring with intermediate jet- grout or ground improvement between soldier piles during lagging placement. work proposed for preparation for site permit 2005/08/04/9463/s.
-
Mar 2013
Install and erect tower crane. ref to building permit #200508049463.
-
May 2014
Tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes - include mep, sprinklers and fire alarm separate permit.
-
May 2014
Tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes. include me- - sprinklers and fire alarm separate permit.
-
May 2014
Tenant improvement consisting of non structural, non load bearing interior paritions, ceilings, millwork, power/signal, finishes - including mep, sprinkler & fire alarm under sep permit.
-
Jun 2014
8/f: t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. access control egress door at stair #2 and elev lobby.
-
Jun 2014
6th floor: t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes.
-
Jun 2014
7th floor: t. i. consisting of non structural non-load bearing interior partitions, ceilings, millwork, power/signal and finishes. f/a and sprinklers under sepatare permit.
-
Jun 2014
Tenant improvement consisting of non structural, non load bearing interior parttions, ceiling, millwork, power/signal and finishes. includes mep. sprinklers and fire alarm on a separate permit.
-
Jun 2015
Interior t.i. to 21/f, new offices, conference rooms, new finishes, lighting, mechanical, power. fire/life safety and sprinkler under seperate permite.
-
Nov 2015
23rd floor: t.i. including partitions and ceilings. life safety deferred.
-
Jan 2016
24th and 25th floor: full floor office t.i. including non-bearing partitions, ceilings and finishes. mep & life safety deferred.
-
Sep 2023
11th fl: t.i includes the demolition of non-str partitions and building new non-structural partitions. all new or revised hvac electrical, plumbing and life safety/prinkler work will be design build and submitted for permit separately. building is fully sprinklered.
-
Mar 2024
25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demolition); deferred mep on separate permit.
-
Mar 2024
24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit.
-
Oct 2024
21st fl interior tenant improvement. new partitons, doors, ceilings, finishes. no change to restrooms, mep deferred.
-
Jan 2025
12th fl ti includes demolition of non structural partitions and build n non str partitions. all mep life safety and sprinlers will be design build and submitted separately. fully sprinklered. restroom work included.
-
Aug 2025
4th fl, ste 400 ti demolition of non-structural partitions and building new non-structural partitions (building is full sprinklered) meps under separate permit life safety & sprinklers under separate permit submitted separately, not included in cost valuation for this pa.
-
Aug 2025
8th/f: t.i. demolition of non structural partitions & building new non structural paritions. all new or revised life safety work will be design build & submitted separately. building fully sprinklerd.
-
Jun 2026
5floor; t.i. demolition of non-str partitions and build new non str partitions. all new revised mep and life safety work will be design build and submitted separately. building is fully sprinkled.
DBI holds 244 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 244. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: and the early tenants. The assessor records 2014; the CTBUH Skyscraper Center records completion in 2015. Submit an update