555 Mission Street
East Cut · San Francisco, CA 94105
Public art
- Moonrise Sculptures: March, October and December — Ugo Rondinone
Aluminum; plaza; open space and artwork are always accessible.
Installed 2008. Three mottled aluminum sculptures of oversized heads stand in the plaza outside 555 Mission Street. - Human Structures — Jonathan Borofsky
Steel; plaza; open space and artwork are always accessible.
Installed 2008. 62 life-size steel figures, water-jet cut and bolted hand-to-hand and head-to-toe, form five interconnected towers in a dozen coded colors. The dataset's title 'Human Sculptures' should read 'Human Structures.' The city's inventory titles it “Human Sculptures”.
Permit history
-
Feb 1991
Install restaurant.
-
Oct 2001
T0 erect 30 stories of office building.
-
May 2004
Shoring and excavation for new building appl 200110130668.
-
Jul 2008
Tenant improvement on floors 20, 21, 22, 23, & 24. non bearing partition walls, electrical, hvac, plumbing, carpet, ceilings, structural support for extra floor loading due to high density of files.
-
Jul 2008
28th, 29th, 30th, 31st floors-new build out for full floor improvement for 4 floors. new non load bearing partitions, ceiling & finishes. mechanical, electrical, plumbing. the sprinkler and life safety seperate permit.
-
Oct 2008
New full floor tenant on previously unbuild, unoccupied floor. new non load bearing partitions, finishes, lighting electrical and mechanical work. no structural on job. fire and life safety under sep permit.
-
Nov 2009
Build out for full floor tenant improvement for the 3rd floor and a partial build out on the 2nd floor including new non load bearing partitions, ceilings, finishes, associated mechanical and electrical. life safety and fire sprinkler under separate permit.
-
Dec 2009
Const of new ceiling-height & slab to slab partitions, assoc electrical, power/light distrib, assoc mechanical sys distr & assoc life-safety system.
-
Dec 2010
15th fl. ti new construction, new 1 hr rated partitions, interior partitions, doors etc. plumbing, mechanical, electrical, title 24. (life safety under sep permit).
-
Dec 2010
14th fl: ti new construction new 1 hr rated partitions, interior partitions, doors etc. plumbing, mechanical, electrical, title 24 calcs (life safety under sep permit).
-
Dec 2010
11th fl: ti new construction, new 1 hr rated partitions, interior partitions, doors, etc. plumbing, mechanical, electrical, title 24 lf sep permit.
-
Jan 2011
6th fl ti: new construction, new 1 hr rated paritions, interior partitions, door, etc. plumbing, mechanical, electrical, title 24 calcs life safety sep permit.
-
Jan 2011
4th fl: ti new construction includes new one hour rated partitions, interior partitions, doors, glaszing, millwork, plumbing, ceiling and finishes. mechanical and electrical. life safety sep permit.
-
Jan 2011
10th fl: ti new construction includes new 1 hr rated construction partitions, doors, glazing, millwork, plumb, ceiling, and finishes. mechanical and electrical. life safety sep permit.
-
May 2011
25th floor - t.i. new construction includes new one-hour rated partitions, interior partitions, doors, glazing, millwork, ceiling & finishes. plumbing, mechanical, electrical & fire, title 24 calculations includes in this submitted. life safety engry submitted under separate permit.
-
Apr 2019
16th floor. t.i removal of interior partitions & finishes. new interior offices, meeting rooms, phone rooms, work rooms, coffee stations to wrap existing core. new office space & open pantry at perimeter windows. new elevator lobby & bathroom finishes. minor mep work & mdf room is existing to remain.
-
Dec 2020
8th fl- construction of non-structural partitions. new acoustical tile and grid and gyp bpard ceilings. new lighting fixtures, millwork and finishes throughout. mep included.
-
Mar 2021
9/f: construction of new partitions, ceiling, light fixtures, millwork and finishes throughout.
-
Apr 2022
32nd floor tenant improvement of office space, conference rooms, break rarea and supporting space. mep included in set.
-
Jun 2024
2nd floor: interior t.i. including new partitions, light fixtures, ceilings assemblies, millwork, and elevators. t. i. on-site amenities (lounge, gym, locker room, etc). structural, mechanical, electrical, plmg, food service included. fire life safty, & sprinkler under seperate permit.
-
Dec 2024
28/f: interior tenant improvement including new partitions, light fixtures, ceiling assemblies, millwork, and plumbing fixtures. mechanical, electrical, and plumbing drawings included. fire life safety and sprinkler under separate permit.
-
Apr 2026
27th floor - architectural only office ti. new partitions & millwork. mep deferred.
-
Jun 2026
24th floor: interior tenant improvement to demolition and construct new non-structural partitions, ceilings, finishes and associated mep.
-
Jun 2026
21st fl - interior ti to demolition and construction new non-structural partitions, ceilings, finishes and associated mep.
-
Jul 2026
29/fl- ti to include new conferencing rooms, employee break area and storage space.
DBI holds 364 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 364. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and who designed the open space. Submit an update