150–180 Oak Street
Hayes Valley · San Francisco, CA 94102
-
1948
Recorded in the city's survey of the Van Ness Avenue automobile corridor as headquarters of the Division of Highways.
-
May 1992
Awning that is 27' long 14 inches out from concrete wall.
-
Dec 1995
Change office to school, interior renovation & landscape.
-
May 1997
Install fire sprinkler system on floors 1 thru 5.
-
Feb 1998
Horizontal addition.
-
May 1998
Interior partitions.
-
Apr 1999
Interior partitions additional classrms & office space 5/f.
-
Apr 2002
Interior remodel in the basement area of the ncis campus facility computer lab multi purpose room.
-
May 2003
Interior remodel of existing basement storage spc to create a student multi-purpose rm, work will in.
-
Jun 2005
Modify existingroom to a computer lab @basement, modify unimproved space into conf.room(s)@basement, modify.
-
May 2007
Interior remodel of existing storage rooms to offices & workrooms. machinal & electrial under seperate permit.
-
Aug 2007
Fabricate and install new supply and return ductwork. provide and install 8 dual duct mixing boxes. provide and install 1 heating coil.this is a revision to permit # 2007/06/14/3979.
-
May 2008
T.i. on 5th & 6th floors. conversion of existing assembly into classrooms & library on 6th fl. various t.i. in classrooms & locations. new pre-approved seat benches in hallways. new m.e.p., fire protection under separate permit. no exterior work.
-
2010
Identified in the city's survey of the Van Ness Avenue automobile corridor but not formally evaluated on a state historic resource form.
-
Jun 2011
Tenant improvement (interior only) & voluntary accessible upgrades/improvements for compliance.
-
Jun 2015
Reroofing.
-
Jun 2019
Non-structural ti work, no change in use, interior remodel with new non-structural partition wall & finishes, work shall be limited to the 3rd & 4th fl only. no exterior work.
-
Mar 2025
Ab-004 priority: phase 1a: partial interior non-structural t.i. work on the 4/f & basement. provide make-up air using the existing mehanical system by rerouting ductwork and air diffusers where applicable. no increase to student population.
-
Mar 2025
Ab-004 priority: phase 1b: renovate restrooms on floors 1-5.replace existing toilet partitions with proviacy partitions where allwed by existing fixture layouts.additoinal gender neutral restroom added to basement & 6/f.expand existing egress stairs #05 from 1-2/f to service basements thru 3/f.add stairs #8 fr 3-6/f.
-
Sep 2025
Ab-004 priority: phase 1c - t.i.: mep upgrades to permit application 202503172389. no associated increase to student population.
-
Oct 2025
300 existing window replacement - replace existing steel sash, single-light, non-tempered with high performing aluminum windows deisgn with tempered, insulated glass & low-e energy efficient coating. same window divisions as existing but greater energy efficieny & building code req.in size opening & safety glazing.
-
Nov 2025
Phase 2: new ext canopies, partial roof/skylights & column removal on 6/f, resurface payyard, new entry gates, ext stairs & ter serving new sep entry & reno of existing main entry with new canopy.nonstruct-ti's basement kitchen.
-
Dec 2025
Ab-004 priority phase 2.2: non-structural int ti-establish staff-operated cafe serving hs students on 6th floor. limited to int arch finishes &typical mep modifications. cafe provide pre-pared, non-cooked food & bev only; no cooking equip, hooods or special ventilation of fp req. student/faculty will.
-
Feb 2026
Installation of a new facu in the basement & to upgrade existing horn / strobe to voice evacuation. this includes addition of remote annunciator, voice evac control panel, update field devices per th enew architectural layout.
-
Feb 2026
Fire sprinkler ti refermce building permit#2025-0314-2389. add: 99, relocate 288, changeout 55, total: 439.
-
Feb 2026
Ab-004 priority phase 2c: voluntary & selective renovation of existing mep systems serving approx 125, 400 gsf of the 177, 800 gsf of entire existing building. proposed mep design will supplement current arch & struc ti. non-seismic struc work ltd to addition of penthouse rooftop support & anchorage of mechanical equip.
-
Feb 2026
Ab-004 priority phase 2.1: int ti-construct new staff-operated kitchen in basement lvl with comm cooking eq, food prep area & servery line. students & faculty will have no access to kitchen. install new grease interceptor with in existing cafeteria & minor arch finish. modification/ext to existingfa & fs as req.
DBI holds 130 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 130. 5 of them are nominal $1 street-space or sidewalk permits.