1616 16th Street
Mission Bay · San Francisco, CA 94103
-
1912
Built as the H. Levy & Co. / Schlessinger & Bender wine warehouse. Designed by G. Albert Lansburgh. The survey credits G. Albert Lansburgh with both the original design and a 1920 alteration.
-
Jan 1986
Install frame on wall with two brass.
-
Aug 1990
Parapet reinforcement.
-
Feb 1991
Lateral upgrade.
-
Feb 1992
Cti-1.
-
May 1995
Upgrade bath, install fixtures, toilets, sinks, grab bars, doors.
-
Aug 1995
Isntall full height gypsum walls (non rated) with in office.
-
Sep 1995
Install 2 12 ft high x 27'-0" long walls along column line.
-
Nov 1996
Repair concrete spall, cosmetic work only.
-
Feb 1998
New loading dock steps.
-
Aug 2002
Remodel an existingplmbg showrm with demolition floor tile & interior partitions.
-
Dec 2003
Create opening fr 1st fl to mezzaning incl construct of steel stairs.also 1 accessible bathroom.
-
Aug 2004
Addendum to an existing tenant improvement app 9519554. this project involves the remodel of an exis.
-
Sep 2004
Tenant improvement - non bearing partition walls, lights, electrical, outlets, hvac, new exit, paint*.
-
Jan 2005
Install hvac unit in expanded area.
-
Feb 2005
To install water curtain system around new opening with 16 new sprinkler heads on 1st floor.
-
Apr 2011
Install solar photovoltaic rooftop system. rack mount system is attached to roof through mechanical connection and ballast.
-
Oct 2013
T.i. at 2/f - including replacement of existing carpet, new lighting and addition of interior partitions to create 2 new offices, one conference room and one storage room. 1 hand rails at existing main entry will be upgraded to comply with accesabilty requirements, new accessible room signage will be.
-
Feb 2014
Add 10 new sprinklers due tenant improvement new walls 2nd fl only.
-
May 2014
Barrier removal. install wheel chair lift.
-
Jan 2017
Renovation of commercial space with new finishes and electrical at interior. replacement of existing ductwork only with no change to mechanical.
-
Apr 2017
Replacement of 2 existing faux windows with 2 new true windows to match adjacent existing windows.
-
Aug 2017
Revision to approved permit application 201701096768, existing hvac system to remain, construction of interior partitions in existing commercial space.
-
Feb 2018
Revision to 201704043137 - added new structural scopes with approved arch. change back in permit 201704043137 maher na.
-
Mar 2020
Project scope is the removal of portions of existing walls. replacement of interior partitions and doors in existing commercial space. (retail trade shop in conformance with pdr-1-d).
DBI holds 36 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 36. 5 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update