251–275 Rhode Island Street
Mission Bay · San Francisco, CA 94103
-
1925
Built as the Dunham, Carrigan & Hyden Co. steel pipe warehouse.
-
Oct 1984
Additions alterations or repairs.
-
Nov 1988
Framing tenant improvements and plumbing.
-
May 1999
Tenant improvement, new door & existing storfront.
-
Nov 2000
New windows @ exterior, repair stucco, new awning, new cornice.
-
Apr 2001
New corridor, lighting, doors in exit tenant space at 2nd floor.
-
Feb 2008
Replacement/repair windows on 2nd floor at south and west side including replacement of damaged window sills.title 24 report seperate permit.
-
Jun 2008
New ada restrooms, corridor extension, demising walls for future tenants. work includes: new partitions, doors, ceiling, plumbing, mechanical, sprinklers, electrical. hvac, electrical, and fire sprinkler under separate permit.
-
Jun 2008
2nd floor: demolistion & reconfiguration of office space to create conference rooms, shared offices, open office sapce & storage, private offices, lobby reception. mep, life safety & fire sprinkler under separate permit.
-
Nov 2008
2nd floor-mechanical, electrical work ofr tenant improvement, reference permit application 2008-0611-4157.
-
Jun 2010
Office ti on the 2nd fl. to include new interior partitions, doors, glazing and millwork, mep, life safety and fire sprinkler under separate permit.
-
Jun 2011
2nd floor reconfiguration of existing office psac eto add four new offices & work area. hvac/electrical & fire sprinkler under separate permit, no increase in office space.
-
Jul 2011
#203- office tenant improvement on 2nd floor to include new interior partitions, doors, glazing, and millwork. mep, life safety, fire sprinkler under sep permit.
-
Mar 2013
T.i. to include interior demolition of non- structural partitions, millwork, lighting and minor, plmg demolition, new non structural partitions, doors frames and hardware. mep & life safety under seperate permit.
-
Aug 2014
Reroofing. compliance with ord 155-13 na.
-
Sep 2014
Replacement of roof top packaged electric heat pump units. maher ordinance # 155-13 n/a.
-
May 2015
Replacement of roof top packaged electric heat pump units ac units. maher ordinance # 155-13 n/a. previous units under permit application 201409025185 (final 5/20/15).
-
Oct 2016
Ti for "e" rstaurant incorporated adjacent vacant retail space. no work to "e" restaurant except to create wall openings. mep under separate permits.
-
Sep 2018
2nd fl: suite 250 - non structural renovation to existing tenant space for new ti scope of work includes: new ceiling, lighting, partition, door, glazing, electrical, data and finishes.
-
Mar 2019
Demolition of suites 200, 201 & 203. demolition ceiling, lighting, existing partitions, doors & glazing millwork, plumbing, electrical and data.
-
Apr 2019
Ste 201, 202 and 203 non structural remodel to existing tenant space per new ti scope of work includes new ceiling, lighting, partitions, doors glazing, plumbing, electrical, data and new finishes.
-
Sep 2019
Mep for 201904258978.
-
Sep 2020
Replacement of rooftop hvac unit.
-
Dec 2023
Lobby improvement: demolition of non-structural partitions, new non structural partitions, millwork, door assemblies, light fixtures, ceiling assemblies and finishes. new interior stairs.
-
Dec 2024
Provide & install one new 5 ton packaged roof top unit, unit to omit on curb adapter, new stand alone thermostat, n) ductwork to match n) layout. n) linneardiffusers. n) power & signal divices thru the space, new 2022 compliant lighting & controls. ref to t.i. 202312152587 mep deferral.
DBI holds 110 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 110. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update