300 De Haro Street
Mission Bay · San Francisco, CA 94103
Permit history
-
Aug 1982
Building use: warehouse.
-
Sep 1982
Building use: warehouse.
-
Jun 1983
Additions alterations or repairs.
-
Jul 1983
Add four skylights to existing building.
-
Sep 1983
Remaining work on permit 8207455 b41ld 1000 ft2 mezanine.
-
Oct 1985
Non structural partitions & doors.
-
Dec 1985
Proposed a new restaurant to a existing building.
-
Jan 1988
Add partition wall with 2 ac outlets, sheetrock.
-
May 1988
Install toilet and mechanical. rm.
-
Feb 1992
Build new walls to define new deli.
-
Jun 1992
Install grease hood, flue and blower.
-
Apr 2001
Street space permit.
-
Jan 2002
Interior remodel, no changes to lighting or mechanical sys, convert office space to vocational training cl.
-
Jul 2004
Erect a 1 story, kiosk (retail/magazines/flower stand).
-
Aug 2004
To erect an atm machine.
-
Jun 2006
Ti for n private test kitchen, work includes n partitions, fixtures, kitchen equip, n bath, n lighting, mechanical including 2 kitchen hoods. no exterior changes fire protection under sep permit.
-
Jun 2006
Provide concrete pad for wells fargo atm in planter, provide light pole at atm, re-stripe existing handicap space to van accessible, re-configure restrooms accessories & fixtures.
-
Sep 2006
Remove e interior walls to create new office space. add bathroom in addition to e h/c access baths in building. new plumbing, more waterheaters, move kitchen, existing hvac systems, nail salon with accessor office space.
-
Sep 2008
Convert drycleaning drop shop to dry cleaning processing plant. install new equipement.
-
Jun 2009
Existing hood changed out for new hood. to comply with item 1 for nov 2009955601.new fire system on separate permit.
-
Jun 2012
Remove existing atm and kiosk. replace with new atm and kiosk.
-
Jul 2021
100% affordable housing mayor ed 13-01: erect a new 11 story, mixed use public housing facility with 425 sleeping units and common use facilities, and two commercial restaurant tenant spaces at ground floor.
-
Sep 2021
Atm lighting: install 1 pole mounted fixture, replace 3 pole mounted fixtures. install 1 wall mounted fixture, install conduits and wire to new pole and fixtures at existing atm.
-
Apr 2025
Priority - demolish a 1-story, type 1 commercial building.
-
Nov 2025
Install new 8" ducktile iron class 53 underground water main to feed new building at 300 de haro for all water tie ins. install new 8" ductile iron class 53 fire water line to feed sprinkler and stand pipe system.
DBI holds 55 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 55.
Not yet documented: the architect and builder and the early tenants. Submit an update