3162–3166 16th Street
Mission · San Francisco, CA 94103
-
May 1993
Reroofing.
-
Jul 2000
Moving the window apprx 4 feet.
-
May 2013
Basement level-repaier water leaking, install new retaining wall, replace 1st floor joists. no ada upgrades per ab-17.
-
Jun 2013
Interior non-structural demolition of dropped ceiling, lighting, existing non-compliant restroom in vacant retail store. accessibitity requirements will be addressed in subsequent tenant improvement permit as allowed in sfbc ab-017.
-
Jun 2013
Interior non structural renovation-new partitions, power, lighting, mechanical system & new accessible restroom & dressing room. storefront to remain as is with re=painting & minor repairs only; separate permit for signage.
-
Apr 2015
To comply with nov #201538583 dated 4/3/15. store front: new drywall for fitting room. rebuild new wood floor and new paint.
-
Aug 2015
Revision to permit application 201504143626; to comply with complaint/violation 201544222 dtd 4-5-15, no power track lighting.
-
Dec 2015
T.i. to existing space. new electrical outlets and lighting. add sinks. upgrade existing bathroom for disabled persons. breakroom. to comply with nov #201538583.
-
Jan 2016
To erect electrical sign.
-
Dec 2019
Comply with planning compliance and notice of enforcment #2019007208 enf. change of use from.
-
July 20, 2022
Mission Dolores neighbourhood survey
Photographed as an example of the single-story commercial buildings of the Mission Dolores neighbourhood — a type the statement calls uncommon there because of high land values, typically storefront windows flanking the entrance under transoms, a flat roof and an interior mezzanine.
-
Feb 2023
Abe#201810022163 upgrades to 1st floor commercial unit per abe requirments. modify (f) sloped entryways, add combination of new sloped surfaces, push-button entry systems & hand/wheel rails to provide accesibile entry - no other work.
-
Feb 2023
Abe#201810022161 upgrades to 1st floor commercial unit per abe requirments. modify (f) sloped entryways, add combination of new sloped surfaces, push-button entry systems & hand/wheel rails to provide accesibile entry - no other work.
-
Nov 2024
Reroofing overlayed no torch down no hot work.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update