55 Fifth Street
South Of Market · San Francisco, CA 94103
-
1913
Built for James B. Lankershim, who had put up another Hotel Lankershim in downtown Los Angeles in 1905. The building carries restrained Classical Revival ornamentation and retains excellent integrity on its upper floors, though the ground floor rustication is not original. Proposed for addition to the Kearny-Market-Mason-Sutter Article 11 conservation district.
-
Apr 1985
New elevator & stairs; new fire restive roof system.
-
Apr 1985
Non-structural demolition all interior non-bearing.
-
Aug 1985
Non-structural demolition all interior non-bearing partition.
-
Aug 1985
Non-structural demolition interior non-bearing partitions.
-
Jul 1986
Tenant improvement permit for restaurant only.
-
Aug 1986
Underpin foundations.
-
Aug 1988
Replace existing sidewalk.
-
Apr 1990
Patch structural damage due to demolition, remove slab.
-
Jan 1991
Partitions, doors, ceilings, electrical. work, hvac.
-
Jun 1991
Repair sidewalk over vaults, & bracing by reinforcement.
-
Aug 1991
Replace 18 existing elevator swing door entrances.
-
Aug 1991
Install a complete automatic fire sprinkler system.
-
Feb 1992
Structural renovations to existing hotel. slab, elev pit.
-
Jun 1993
Handicap bathrms/movable partit 2nd fl/lighting/cab fixtures.
-
Oct 1993
New kitchen equipment.
-
Mar 1994
Fire alarm system for all floors.
-
Oct 2000
Reroofing.
-
Feb 2003
Underpinning for 835 market street.
-
Jun 2012
Addition of 8 guest rooms, creating a light well & renovation of guest restrooms for ada upgrades & installation of more effecient fixtures as well as finishes. the additional 8 guest rooms will include restrooms.
-
Aug 2012
Exterior work includes new entry canopy and increases the size of an egress exit at rear. interior work includes renovation to 1st and 2nd floor. no work will be done to the basement and floors 3-8. work includes ada upgrades to restrooms. mechanical, electrical, plumbing as part of separate permit.
-
Feb 2013
Basement level-work includes minor demolition & the construction of walls & doors to create 2 new locker rooms, 2 storages & 2 offices. mechanical, electrical, plumbing, fire alarm and sprinklers shall be filed as part of a separate permit.
-
Feb 2013
1st floor - remodel of a room service kitchen - construction of walls, doors, wall base, ceiling & kitchen equipment. m.e.p & fire alarm, fire sprinkler under separate permit.
-
May 2013
(1st floor): renovation of existing restaurant, removal/upgrade doors, walls, ceilings & floors. new kitchen equipment, addition of one accessible unisex bath, one addioitnal bar.
-
Jun 2013
Install 5 new pipe, 1 grease hood, install 1 new pipe, 2 vapor hood. new hood to connect to existing fans. trunk line, add/relocate wall & ceiling diffusers, extend ductwork as needed.
DBI holds 80 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 80. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update