(Old) Hale Brothers Department Store
901 Market Street
-
1912
The Hale Brothers Department Store was built, six storeys of about 220,000 square feet, composed as a two-part vertical block over a glass base with Renaissance/Baroque ornament. It later housed a J. C. Penney department store.
-
August 18, 1912
The Paraffine Paint company contracted for composition roofing on a five-storey and basement reinforced concrete building, then going up, at $1,635.
-
1922
KPO, one of San Francisco's earliest radio stations, went on the air from the sixth floor, which it shared with the store's radio sales division; Hale's largely paid for the station.
-
1944
The entrance canopy was significantly altered and the transom area stuccoed.
-
1972
The entrance canopy was removed altogether.
-
Mar 1984
A new atrium will be cut into the office fl., new elevator.
-
1985
Rehabilitated for shops and offices: new floors, a five-storey atrium through floors two to six, new lifts and stairs, seismic bracing, the leaded-glass storefront transoms and east entrances restored, a new canopy of glass-fibre reinforced concrete hung in the original manner, and the rooftop floor enlarged with the old water tower removed.
-
Jun 1985
Tenant improvement for department store interior.
-
Aug 1986
Tenant improvement including new partitions ceiling & finish.
-
Nov 1986
Ati-including new partitions, finishes & ceiling.
-
Dec 1986
Ati-single tenant floor, tenant improvements.
-
Dec 1986
Accelerated permit - including new partitions, finishes.
-
Jul 2009
First floor storefront improvements on market st. & 5th. st.
-
Nov 2012
Interior non structural tenant improvement on the existing office space on the 3rd floor. mep and fire safety under separate permit.
-
Nov 2012
Mep work at existing office space on the 3rd floor. ti appoved under app#201211053549.
-
Mar 2013
Struc, arch, mechanical upgrades on the grd thru 3rd floor. demolition of mezzanine, install elevator & a pair of escalators between floors 1 & 2. infill areas at grd floor where existing level changes occur & existing retail entry to basement. add 3rd exit stair from 2nd floor.change use base of atrium from 2nd to 3rd floor.
-
Jun 2013
Interior tenant improvements for retail store including non-structural partions and associated plumbing, electrical and mechanical systems. new restrooms. sprinkler and fire alarm revisions under separate applications.
-
May 2014
Basement, 1st floor - structural & architectural upgrades a basement & 1st floor. installation of an elevator & pair of escalators between basement & 1st floor. area to remain unoccupied during work. n/a maher ordinance.
-
Jun 2014
6th floor: full floor tenant improvement including non-bearing partitions, glazing doors, millwork- associated mep under separate permit- fire life safety under deffered submittal, no structural work to be completed; maher n/a.
-
Jun 2014
5th floor: tenant improvement including non load bearing partitions, glazing, doors mill work, mep, fire, life safety and structural under separatge permit; maher n/a.
-
Jun 2014
5th and 6th floor: mechanical work for t.i. to include water source heat pumps vav boxes. new air diffusers. 5th floor: arch app#201406249220 and 6th floor: ref arch #201406249224. n/a for the maher ordinance #155-13.
-
Nov 2014
Interior alteration to include architectural, mechanical, structural, electrical, and plumbing works. interium control & maher n/a.
-
Feb 2015
1st floor & basement remodel of existing retail space to include new floor openings & structural strengthening. work for structural strengthening only. n/a maher ordinance.
-
Sep 2016
At&t wireless facility - installation of unmanned wireless faciity on rooftop. fully screened on the north and north west corner of the building. screen wall painted to match. support equipment and (4) antennas per (3) sectors behind screen wall. no height increase is proposed.(maher ord. 155-13 n/a).
-
Dec 2017
3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork.
-
Jul 2022
Work includes: modification of existing tenant-selective demolition of non-baering walls. new light fixtures/switches and new finishes per plans. no structural work under this permit.
-
Jul 2022
Ste 400 & 470 - 4/f: selective demolition of non-bearing partitions, ceiling grid and light fixtures, new light fixtures/switching and new finish. mep deferral.
-
Nov 2022
Lower level & street level - commercial t.i. of 39, 743 sq ft., minor exterior modifications, new storefront w entry doors, ross dress for less. fire sprinkler/fire alarm deferred.
-
July 1, 2026
Plans Filed For Office-to-Housing Conversion at 901 Market Street, San Francisco — San Francisco YIMBY
DBI holds 265 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 265. 13 of them are nominal $1 street-space or sidewalk permits. 3 expired permits are not shown.
Nearby
- 870–898 Market Street Same street
- 923 Market Street Same street
- 422 Stevenson Street Same block
- 925 Market Street Same block
- 929 Market Street Same block
- 34–36 5th Street Same block
- 34–38 Mason Street Around the corner
- 55 Fifth Street Around the corner