200 Bush Street
Financial District · San Francisco, CA 94104
-
1930s
The weekly San Francisco Russian News had its office at this address in the 1930s.
-
Oct 1981
Additions alterations or repairs.
-
Oct 2011
6th floor ti: includes demolition of non structural partitions and building non structural partitions. demolition under sep permit. ref sheet ad.06 for additional demolition. all new or revised hvac, electrical, plumb, life safety design build and submitted separately. fully sprinklered.
-
Oct 2011
8th fl ti: new non structural partition and upgraded restroom. demolition work in suite 800 and 810 sep permit. refer to sheet ad.8 for reference only. new or revised hvac, electrical, plumbinf, life safety design build and submitted under sep permit.
-
Nov 2011
Voluntary upgrade fire alarm system replacement project. no exterior work.
-
Apr 2012
4th floor: t.i. include the demolishing of nonstructural partitions and build new nonstructural partitions. all new or revised hvac, electrical, plmg and life safety work will be design-build and submitted for permit seperately.
-
Jan 2013
7th floor: t.i. include the demolishing of non structural partitions and build new non structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design, build and submitted for permit separately. building is fully sprinklered.
-
Aug 2013
14/f, 15/f- t.i. includes the demolition of non-structural partitions and building new non structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be design-build and submitted seperately, building fully sprinklered.
-
Sep 2013
5th floor: t.i. to include demolition of non-structural partitions and buildings of new non-structural partitions. mep and life safty under seperate permit.
-
Oct 2013
9th fl. ti includes demolition of non structural partitions and building new. non structural paritions. all new or revised hvac, electrical, plumbing and life safety. work be design build and submitted separtely.
-
Nov 2013
3/f- t.i. includes the demolition of non-structural partitions and building new non-structural partitions. all new or revised meps, life safety work will be design build and submitted seperately.
-
Dec 2013
12th fl ti including demolition of non structural paritons and building new non structural partitions. all new or revised hvac, electriclal, plumbing, and life safety work will be design, build and submitted for permit separately. building is fully sprinklered.
-
May 2014
1st floor & mezz - t.i. includes demolition of non structural partitions, mezzanine to ground floor new exit stair (structural under separate permit), new non-str. partitions, new restrooms. all new or revised hvac, electrical, plumbing & life safety will be submitted separately. fully sprinklered.
-
Aug 2014
3rd floor t.i. includes: demolition of non-structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plumbing & life safety. work will be design-built & submitted separately (building is fully sprinklered).
-
May 2015
Ground floor tenant improvement in existing vacant space. construction of new bar including finishes, millwork, equipment lighting & plumbing. no exterior work.
-
Aug 2016
Demolition of existing & buid back of tenant space. mep under separate permit.
-
Oct 2016
Suite 1100: relocate fc unit, inst. fc unit, install ductwork, & refrigerant pricing, provide nw lighting & branch circuiting to existing panel, maintain some existing power, provide additional nw power branch circuits & raceway systems as reqrd. provide ca title 24 compliances forms. ref app#201608195483.
-
Dec 2016
1 st floor: restaurant ti - plumbing, electrical lighting mechanical and new finishes. convert existing retail to restaurant.
-
Jun 2017
8/f- t.i. demolition of non-structural partitions, build new non-structural partitions, all new or revised meps, life safety and sprinklers will be design build and submitted seperately. building. is fully sprinklered.
-
Dec 2017
2nd fl - tenant improvement, partitions, finishes, lighting & equipment, restrooms, conference room, open office, pantry, print room, reception area.
-
May 2018
2nd floor: t.i. adding new walls, restrooms and cleaned up finishes.
-
Oct 2018
New lighting and branch circuiting. new power and signal outlets.
-
Nov 2018
8th fl - ti to demolition finishes and millwork and construct new non-structural partitions, ceiling and finishes. mep, sprinkler/ls on seperate permit.
-
Jul 2019
Ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee only.
-
Sep 2019
10th floor. demolition of non structural interior walls, installtion of new non structural walls & finishes.
-
May 2026
Interior tenant improvement: demolition of non-structural partitons, new partitions for (2) new offices and coffee bar, new millwork plumbing fixtures, and lighting, electrical plumbing, fire and life safety under sep permit no havac at 115 sansome st. building has operable windows and steam heat.
DBI holds 234 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 234. 7 of them are nominal $1 street-space or sidewalk permits.