160 King Street
South Beach · San Francisco, CA 94107
-
1887
The site was first developed in 1887 by the Pacific Oil and Lead Works, which made linseed and coconut oils for the paint trade. The ground now carries an office building of 2002.
-
1946
A three-storey reinforced concrete building of 61,525 square feet, about forty feet to the parapet, put up in 1946 as a food supply depot for the U.S. Navy. It was cleared for the office building of 2002.
-
1984
The Hearst Publishing Company used the building as a printing plant until at least 1984, after which design firms and a garment assembly shop took it over. The building was cleared for the office building of 2002.
-
Aug 1984
Add 10000 sq ft. to building. & remodel exist. 63000 sq ft.
-
Jan 2000
To erect office/retail parking.
-
Nov 2001
Oti-1 9th floor el me ls sp.
-
Nov 2001
Oti-1 8th floor el me ls sp.
-
Nov 2001
Oti-2 9th floor el me.
-
Nov 2001
Oti-2 8th floor el me.
-
2002
Built.
-
May 2002
New retail interior buildout in shell at 1/st floor mechanical & electrical under sep plan.
-
Mar 2003
Oti-1 7th floor, el, me, ls, sp.
-
Mar 2003
Oti-2 7/f el me sp.
-
Apr 2012
8th floor-tenant improvement including new partitions, glazing, doors, millwork & mechanical. electrical, fire sprinklers & life safety under seperate permits. garage door seperate permit.
-
Apr 2012
Mechanical and electrical for tenant improvement on the 8th floor. reference arch 201204168322.
-
Mar 2013
9th floor-tenant improvement consisting of new partitions, glazing, doors, millwork. mechanical, electrical, fire sprinkler and life safety under sep permit.
-
Apr 2013
9th floor-mechanical & electrical work for tenant improvement. refer arch #2013-0313-2051.
-
Nov 2016
Non-structural demolition new non-structural partitions, glazing, millwork finishes. no change in occupancy, use or area. mep and fire under separate permit. n/a for maher.
-
Feb 2018
7th floor - ti to include new partitions, mep, glazing, doors and millwork. fire/life safety under sep permit maher na.
-
Apr 2018
8/f: t.i. consisting of new interior partitions, glazing, doors & millwork; new lighting, electrical, audio visual, telecom, plumbing, & mechanical. maher ord 155-13.
-
Jun 2018
9th floor - ti - new partitions, glazing, doors & millwork. new lighting, ele work. telecom, plm and mechanical maher na.
-
Jul 2018
Remove and replace one existing packaged unit.
-
Aug 2018
6th fl - ti on the 6th fl to include new partitions glazing doors millwork. mep, life safety and fire sprinkler under separate permit.
-
Sep 2018
Rev to existing communicating stair. demolition existing stairs between 9&8 floors. create new openings from 8-6 floors. construct new communicating stairs between 9 & 6th floors with new finishes, hand rails & guard rails. maher n/a.
-
Apr 2019
Change of use from retail to person service, boxing studio. interior only tenant improvement. 6451sf. f/a l/s deferred. maher n/a.
-
Aug 2020
Ti includes demolition on non-structural partitions and building new non-structural partitions. all new or revised mep will be fully engineered & part of this submittal. life safety and sprinklers if needed will be design buils & submitted separately. building is fully sprinklered.
-
Oct 2022
Like for like replacement of 2 ac units. not visible from street.
-
Mar 2026
Installation of 50 level ev charging stations & electrical gear/equipment to support charger energization.
DBI holds 279 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 279. 5 of them are nominal $1 street-space or sidewalk permits.