136–138 King Street
Hotel
-
Sep 2009
Build 200 sq ft max coffee bar to make espresso and coffee using p0ur over method in existing software energy management showroom/business. no food cooking, no warming equipment, no toasters, no microwaves. coffee and tea bar only. add bypass entry door to roll up door.
-
Jun 2013
Erect 12 stories of hotel for 149 guestrooms & 11 lockoff guest rooms.
-
Sep 2014
Demolish one story of office building.
-
Oct 2014
Shoring tiebakcs and soldier beams with wood lagging.
-
Nov 2014
One tower crane erection. new construction under site permit 2013-0628-0783. maher - n/a for maher ordinnance.
-
Dec 2014
Per permit application 201306280783s, new address to block 3794, lot 024 as 138 king st (hotel) and 136 king st. (bar).
-
May 2016
Installation of remote fuel oil fill port, pump, and lines for generator and belly tank on the 12th floor/roof. n/a for maher ref permit application 201306280783 s6 for generator and tank.
-
2017
Current structure built.
-
Mar 2017
T.i. for a basement kitchen and breakfast room and level 1 bar including fixtures, finishes, mechanical, electrical and plumbing in an existing hotel. ref. permit application 201306280783 (new building) & 201612165250 (rev. addendum 2). n/a ordinance #155-13.
-
Mar 2017
Deferred submittal for permit application 201306280783 & #201612165250 for main entry awning. work includes sturctural work & finishes of main entry canopy. no mechanical, electrical, plumbing or fire protection work. n/a maher ordinance.
-
Mar 2017
Evacuation signage maps. n/a for maher.
-
Apr 2017
Erect electric double faced projecting sign "via". n/a ordinance #155-13.
-
Apr 2017
Erect single faced electric sign "hotel via". n/a ordinance #155-13.
-
Apr 2017
Erect single faced electric sign "bar via". n/a ordinance #155-13.
-
Jun 2017
Update to roof occupancy, no change to work. ref #201703091124. no work.
-
Jun 2017
Revision to 201703091124: modification to kitchen equipment for existing hotel ti in basement. no change in occupancy, no exterior work. fire/life safety under sep permit maher na.
-
Oct 2017
Administratibve permit to reflect guest rooms as shown on permit application and approved plans showing 160 guest rooms.
-
Nov 2017
Revise roof deck occupancy from a-3 to a-2. no actual construction work to be performed. admin permit.ref. permit 201306280782 s2 maher nan not ti work.
-
Aug 2019
Modification within existing hotel to provide a guestroom with mobility features. mep is part of separate permit.
-
Sep 2019
2/f: (1) advanced multi-cri fire/co-detector, (1) low frequency sounder base, (1) control module, (1) wall mounted strobe, (1) wall mounted speaker strobe.
-
Oct 2019
Modification within existing hotel, add 2 additional heads to ada guest room. ref app#201306280783. ref #2019-0814-8746.
-
Dec 2019
As build to add 1 sprinkler head and relocate one sprinkler head. ref app#201910114313.
-
May 2021
Errcs upgrade - revision to permit application 2013-0628-0783-s5 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna with a panel antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections with ccsf dt & sffd.
-
Jun 2023
160 smoke detectors will replace 160 dual carbon/smoke detectors per approved sffd meeting minutes.
-
Aug 2024
Provide fire alarm verification to existing addressable smoke detectors in the guestrooms and to provied 9v battery operated smoke alarms into guestrooms in accordance with sffd mod method of construction ab-005.battery smoke alarms provided/installed by property owner.
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 2 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 128 King Street Same street
- 160 King Street Same street
- 170 King Street Same block
- 133–135 Townsend Street Same block
- 139 Townsend Street Same block
- 123–131 Townsend Street Same block