37.7322, −122.3757 A locator map appears here once a Mapbox token is configured.

900 Innes Avenue

Bayview Hunters Point · San Francisco, CA 94124

  • Built 1900
  • Industrial building
  • 1 story
  • Zoned NC-2
  • District 10
  • Historic status: historic resource
37.7322, −122.3757 Street View appears here once a Google Maps embed key is configured.
695 sq ftBuilding area
1,873 sq ftLot area
4Rooms · 1 bath
  1. 1868

    Johnson J. Dircks, born in the Netherlands, was the first known boat builder to move to Hunters Point, establishing a yard at the corner of 5th (Evans) Avenue and L (Lane) Street. He moved all of his operations to a site next to William Stone's on 9th (Innes) Avenue in 1876.

    Area B Survey context statement, 2010
  2. circa 1875

    The Dircks Residence was built — one of three structures surviving from the earliest era of wooden boat building at India Basin.

    Area B Survey context statement, 2010
  3. 1961

    Anderson & Cristofani bought the cottage and converted it into an office for their shipyard, which used it until 1997.

    India Basin Survey and Context Statement, adopted 2008
  4. May 2013

    Reroofing.

    Complete Permit 201305146827 $$$ $6,800
  5. Jan 2021

    Work to occur around structure/cottage. offset work 5-ft from structure/cottage; minimal grading work and fill proposed around offset perimeter.

    Expired Permit 202101273434 $$$ $7,500
  6. Mar 2021

    Includes the rehabilitation & rescue of a historic landmark residential building (landmark #250).

    Complete Permit 202103237136 $$$ $1,868,000
  7. Mar 2021

    Erect a 2 stories food concessions & public restroom, type vb with no basements, no dwellings.

    Complete Permit 202103247213 $$$ $2,220,000
  8. Mar 2021

    Erect a 1 story office, storage, no dwellings, no basement. type vb building.

    Complete Permit 202103247214 $$$ $1,000,000
  9. Mar 2021

    Erect a 1 story community pavillion, no dwellings, no basements. type vb building.

    Complete Permit 202103247215 $$$ $1,200,000
  10. Feb 2023

    Priority process - 1. the existing cottage is to be jacked up and temporarily supported. 2. temporary shoring under and adjacent to the cottage is to be installed. this work is to take place at the cottage which already has an existing permit, permit application 202103237136.

    Complete Permit 202302242559 $$$ $590,000
  11. May 2023

    Overhead f/s installation - (97) heads. ref pa 2021-0323-7136.

    Complete Permit 202305198202 $$$ $38,800
  12. Jun 2023

    Priority process-shoring sytem to construction foundations to the maintenane building at the park project. new construction bpa#202103247214.

    Complete Permit 202306150208 $$$ $10,000
  13. Aug 2023

    New facp unit in maintenance building.install of f/a remove annunciators at entrance doors of 4 buildings which are netrworked and connected by u/g conduit.installation of notification devices throughout the buildings per code to be activated by the new facu & remove power supply located next to facu.

    Complete Permit 202308245142 $$$ $37,802
  14. Sep 2023

    Furnish/install fire services, fh, piv's, bfp & cage from back of curb to asr's. material data submitted/approved, bpa#202103237136.

    Issued Permit 202309227206 $$$ $166,000
  15. Aug 2024

    As built scope: installation of duct detectors and relay modules for fire smoke dampers control in food pavillion and maintenace building. ref permit application 202308245142.

    Complete Permit 202408098321 $$$ $3,103
  16. Aug 2024

    Hood and duct fire system installation ref 202103247213.

    Complete Permit 202408209017 $$$ $4,050
  17. Dec 2024

    Revised as built scope: waterflow alarm bells, replaced with weatherproof horn strobes at all (4) buildings. ref permit application 202408098321.

    Complete Permit 202412036012 $$$ $1
  18. Mar 2025

    Addition of egress lighting per request of sffd at final inspection ref pa 2021-0324-7213.

    Issued Permit 202503051647 $$$ $3,000
  19. Feb 2026

    To obtain final inspection for work approved under permit application 202101273434. all work is complete.

    Complete Permit 202602055352 $$$ $1

The assessor dates the building 1900; the 2010 survey dates it about 1875. Most pre-1906 buildings in the district carry a default assessor date of 1900, because the city's building records were destroyed in the 1906 earthquake and fire.

Not yet documented: the architect and the early tenants. Submit an update